Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Daily Checklist (To be Completed at 0800)

  • All Roller Doors to be opened by 0600 (unless adverse weather conditions)

  • All Light are On

  • Daily Precheck Inspections are to be completed for all Workshop Forklifts and EWP

  • Fuel Bowser are to be inspected for cleanliness, empty rubbish bins and replace soapy water

  • Clean Bowser Trap on Friday each Week

  • Wash Bay to be inspected, needs to be clear of debris (Wheel Nut Indicators)

  • Empty Bins in Workshop and Change room if required

  • Clean Change room, overall away, place dirty overall bag out front of Smoko room (Tues & Thurs)

  • Yard Check, Inspection of Loading Dock

  • Inspect outside Workshop to ensure that all Workshop controlled areas are clean, parts are secure

  • Pit walk through, Clean as required

  • Ensure Tyre Shed had been unlocked

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.