Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

External

  • Road damages fixed by bitumen resurfacing

  • Are all the kerb and channel fixed?

  • Is the Nature strip fixed by landscaper?

  • Is all the foot path fixed?

  • Is cross over free from cracks?

Services

  • Water meter clean

  • Gas meter clean and pipes covered with UV rays

  • Electrical meter clean

  • Post box clean

Brick Fence

  • Wash completed or render completed

  • Brick capping completed

  • Brick slats completed

Driveway

  • Expansion joints completed

  • All the pits clean

  • Pit cover installed and secured

  • Is there any damage in the driveway?

Porch

  • Is the porch slab cleaned

  • Porch eves painting completed and no nails exposed

  • Quads around the porch ceiling were installed properl

  • Porch columns rendered or brick cleaning neatly

  • Porch capping has a mininum 3 degree of slope

  • Weep hole in porch area 50mm above F.F.L

Entrance

  • The entrance door was installed with locks

  • The entrance door was painted all around including the top and bottom

  • Weather seal installed

  • Entrance door hinges installed with enough screws

  • Entrance door sil is painted

  • Equal 2mm gap all around the door

  • Door flush with the doorjamb

  • Skirtings in the entrance area are straight and painted

  • Architraves around the main door were installed and painted properly

  • Entrance door lock is working properly

Living

  • Windows and sliding doors architraves painted and completed

  • Skirtings straight and painted

  • Flooring level and no squeaky noises

  • Living area cornices installed and painted properly

  • The living area walls are plumb and painted with 3 coats of paint

  • Living area lights were installed as per RCP plan and working

Garage

  • Roller or panel door installed

  • No damage to the door

  • Brackets of panel door installed with enough screws

  • The garage rear door installed

  • Rear door hinges and screws weather sealed, locks installed and working

  • Garage-to-house door installed

  • Garage-to-house hinges and screws weather sealed, locks installed and working

  • Garage skirtings on all 3 sides have been installed and painted

  • Garage walls ceiling cornices installed installed and painted

  • Garage floor free from dents, paint marks, concrete

  • Garage lights are power points installed per the RCP plan

  • Above panel door walls and ceiling painted

  • Garage brickwork cleaned and free from paint

  • NBN box inside the garage is neat and clean

  • Storage area inside garage installed as per council requirement

  • Is the bike rack installed as per the council plan

  • Is overhand storage required

Kitchen

  • Benchtop installed as per approved layout

  • Kitchen sink was installed as per the colour selection

  • Kitchen sink free from scratches

  • Provisions provided for dishwasher and microwave

  • Corking completed around the benchtop

  • Cooktop, rangehood and oven installed as per colour selection

  • Drawers and benchtop installed as per colour selection

  • The fridge space has been installed as per the approved layout

  • Fridge space painted

  • All overhead cupboards installed as per colour selection

  • Kitchen lights, switches, GPO and pendant lights were installed as per RCP plan

  • Kitchen window installed and architraves installed

  • Pantry installed as per approved layout

Dining

  • Windows and sliding doors architraves painted and completed

  • Skirtings straight and painted

  • Flooring level and no squeaky noises

  • Living area cornices installed and painted properly

  • The living area walls are plumb and painted with 3 coats of paint

  • Living area lights were installed as per RCP plan and working

Powder Room

  • The door installed as per the colour selection

  • Is the powder room door installed with lift-off hinges

  • Installed with locks, hinges, screws and locks working properly

  • The door closing smoothly and 2mm gap all around

  • Skirting tiles installed and corked on all 3 sides

  • Flooring tiles were installed with equal grout thickness and the grout is clean

  • The toilet is installed and working properly

  • Vanity installed and the water tap working properly

  • Vanity splashback installed

  • Vanity miroor installed

  • Lights GPO and exhaust installed as per RCP plan

  • Walls and ceiling painted without defects

  • The toilet role holder and towel rail installed

Master Bedroom

  • The door was installed with a handle

  • The door was painted all around including the top and bottom

  • Door hinges installed with enough screws

  • Equal 2mm gap all around the door

  • Front and back of door architraves installed and painted

  • Windows in bedroom installed and architraves around completed

  • Please check if the window is obscure or overlooking

  • Walls straight and plumb

  • Skirtings installed and painted

  • Robes installed as per layout

  • Top and bottom of robe tracks installed with enough screws and no end gaps

  • No scratches or damages in tracks

  • Robe doors installed and plumb with the walls

  • Flush pull installed with robe doors

  • Internal shelving installed as per approved layout

  • Flooring completed

  • No squeaky noise in flooring

  • Architraves, skirting, walls, ceiling, and cornices painted withought any defects

  • Lights, switches, and GPO installed as per the RCP plan

Bedroom 2

  • The door was installed with a handle

  • The door was painted all around including the top and bottom

  • Door hinges installed with enough screws

  • Equal 2mm gap all around the door

  • Front and back of door architraves installed and painted

  • Windows in bedroom installed and architraves around completed

  • Please check if the window is obscure or overlooking

  • Walls straight and plumb

  • Skirtings installed and painted

  • Robes installed as per layout

  • Top and bottom of robe tracks installed with enough screws and no end gaps

  • No scratches or damages in tracks

  • Robe doors installed and plumb with the walls

  • Flush pull installed with robe doors

  • Internal shelving installed as per approved layout

  • Flooring completed

  • No squeaky noise in flooring

  • Architraves, skirting, walls, ceiling, and cornices painted without any defects

  • Lights, switches, and GPO installed as per the RCP plan

Staircase

  • Stringers, steps and landing installed as per the approved layout

  • Balustrades installed as per colour selection

  • No gaps between steps and stingers

  • Painting or stain to stringers and steps done correctly

  • Staircase lights installed as per the approved RCP plan

  • Stairvoid walls and ceiling plaster and painted properly

  • Stairvoid window installed and architraves

  • Staircase window cleaning completed

  • G.F and F.F expansion joints are covered properly

  • Staircase handrails sanding and painting completed as per colour selection

  • Staircase steps covering installed as per selection

Bed Room 3

  • The door was installed with a handle

  • The door was painted all around including the top and bottom

  • Door hinges installed with enough screws

  • Equal 2mm gap all around the door

  • Front and back of door architraves installed and painted

  • Windows in bedroom installed and architraves around completed

  • Please check if the window is obscure or overlooking

  • Walls straight and plumb

  • Skirtings installed and painted

  • Robes installed as per layout

  • Top and bottom of robe tracks installed with enough screws and no end gaps

  • No scratches or damages in tracks

  • Robe doors installed and plumb with the walls

  • Flush pull installed with robe doors

  • Internal shelving installed as per approved layout

  • Flooring completed

  • No squeaky noise in flooring

  • Architraves, skirting, walls, ceiling, and cornices painted withought any defects

  • Lights, switches, and GPO installed as per the RCP plan

Bed Room 4

  • The door was installed with a handle

  • The door was painted all around including the top and bottom

  • Door hinges installed with enough screws

  • Equal 2mm gap all around the door

  • Front and back of door architraves installed and painted

  • Windows in bedroom installed and architraves around completed

  • Please check if the window is obscure or overlooking

  • Walls straight and plumb

  • Skirtings installed and painted

  • Robes installed as per layout

  • Top and bottom of robe tracks installed with enough screws and no end gaps

  • No scratches or damages in tracks

  • Robe doors installed and plumb with the walls

  • Flush pull installed with robe doors

  • Internal shelving installed as per approved layout

  • Flooring completed

  • No squeaky noise in flooring

  • Architraves, skirting, walls, ceiling, and cornices painted withought any defects

  • Lights, switches, and GPO installed as per the RCP plan

Ensuite

  • Door installed, painted all around including top and bottom

  • Wall tiles and floor tiles installed as per colour selection

  • Corking around the vanity tiles completed

  • Shower screen installed and supported firmly

  • Shower drain and water test completed, ensure no water leak

  • Toilet installed and corking completed around the toilet

  • Toilet role holder installed

  • Towel rail installed

Bath

  • Door installed, painted all around including top and bottom

  • Wall tiles and floor tiles installed as per colour selection

  • Corking around the vanity tiles completed

  • Shower screen installed and supported firmly

  • Shower drain and water test completed, ensure no water leak

  • Toilet installed and corking completed around the toilet

  • Toilet role holder installed

  • Towel rail installed

Lower Roof

  • Ensure the lower roof is clean

  • Are there any damaged roof tiles

  • No damaged colour bond roof sheets

  • Box gutter fascia on gutter clean from construction materials

  • Roof tiles under lead flashing connected with clips

  • Spreader installed as per the guidelines

  • All the ridges are completed with proper pointing

  • Ensure no scratches on the Valley iron

Cladding

  • All lower eves installed and painted properly

  • All upper eves installed and painted properly

  • All upper windows cleaned externally

  • All first floor claddings installed as per documentation

  • Privacy screen installed as per uploaded documentation

Brick Work

  • Cleaning completed

  • All articulation joints (AJ) are continuous and installed as per the documentation

  • All AJs external corking completed

  • Mortar thickness between bricks within 5mm tolerance

  • All weep holes clean

  • Sill bricks are slopes away from the building

Landscape

  • Garden beds along the driveway done as per the approved landscape plan

  • In front of house steps, garden beds and landscaping done as per approved landscape plan

  • Backyard clothesline, storage shed, and water tank were installed as per the approved landscape plan

  • All downpipes painted

  • Ensure water tank charge lines working

  • Hot water system installed

  • Internal fence completed

  • Boundary fence completed as per approved landscape plan

  • Gates installed as per approved landscape plan

  • Check requirement of flat zone mesh required at the bottom of fence

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.