Concrete finish floor finish level as specified in Architectural/ TP Drawings/ Slab Plan
-
Insulation has been provided as per energy report/Slab Plan
-
Slab edges are straight and Square
-
Brick rebate of 190mm minimumor as specified in slab plan to match with surrounding finish floor level
-
Stud wall and Brick overhand less than 20mm
-
Slab level deviation less than 4mm in any 2m length
-
Reinforcement not visible
-
No Honeycomb in Vertical conrete face
-
No visible crack in the slab
-
Deepen Rebate is provided in decking area with timber Sub floor construction
-
Shower set down are provided if required in C&M
-
Slab recesses are provided for steel base plate as per engineering details and Slab plan
-
All services (electrical/plumbing) conduits provided and positioned as per plan
-
All defects are informed to Concrete contractor and rectified
-
Is the site clean of rubbish and debris
-
Are there any internal or external damages to the property