Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Is Road is clean from Construction Rubbish?
-
Is Nature strip, foot path, cross over clean from Construction rubbish?
-
Is tree protection in the nature strip is safe and free from construction rubbish?
-
Is the Front fence is properly secured with star pickets and clamps
-
Is the left side boundary fence or temporary fence secured firmly and confirm there is no gap?
-
Is the Right side boundary fence or temporary fence secured firmly and confirm there is no gap?
-
Is the Rear side boundary fence or temporary fence secured firmly and confirm there is no gap?
-
-
Is the banners properly installed and secured?
-
Is the Gate set up completed inside the driveway with lock?
-
Is test and Tag is valid and access to temporary power pole is clear and safe?
-
Is Temporary toilet access is clear and safe? Soap and toilet paper placed & monthly clean up completed. Is additional clean up required?
-
Is Rubbish cage got the top closed &properly secured? Is the call out required to empty the cage? Is the booking completed? Is the site have enough rubbish cages?
-
Water tap is accessible and proper water tap installed. Check the requirement of drainage points.
-
Is the Barricade or hard fencing required to manage risk?
-
Is the stair void ladder secured and handover certificate attached? Please confirm Stair void is not altered?
-
Is the 2 plank access is secured and handover certificate attached? Please confirm 2 plank is not altered?
-
Is the scaffold ladder secured and handover certificate attached? Please confirm scaffold is not altered?
-
Is the Edge rail installed and handover certificate attached? Please confirm Edge rail not altered?
-
Check and confirm all the drainage pits cover protected with floorboards - No tripping hazard.
-
Is the balcony protected with fall protection?
-
Check the first-floor window or sliding door needs temporary timber rails or blocks to make safe.
-
Ensure trenches protected with Barricades.
-
Ensure all around the property and inside the property house keeping completed daily basis.