Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
Sewer
-
Contractor used slab plan/Sewer plan to install the sewer point and Stack locations
-
Stack location as per Plan
-
Sewer location as per Slab plan
-
Traps are installed for freestanding bathtubs on ground floor slab
-
Sewer risers are provided in all required locations (kitchen, bathrooms, laundry etc)
-
Sewer risers are provided in walls for wall hung vanities and basins
-
Sewer risers are capped
-
Drainpipe has minimum ground over
-
Approved backfill materials has been used
-
Provide a sewer pipe Markup plan in Engineering Drawings to Supply to concreter
-
If required, service conduit for kitchen island is provided
Storm Water
-
Stormwater has been completed as per approved Civil Plan
-
All pits are installed in correct locations as per council endorsed drainage plans. (Please upload images with information of Pipe in Pits)
-
Pit type and dimensions match with pit schedule in council endorsed drainage plans
-
Pit cover levels are correct as per council endorsed drainage plans
-
Step irons are installed if required in council endorsed drainage plans (pit deeper than 900mm)
-
Stormwater drains pipes size/type/diameter is correct as per council endorsed drainage plans
-
Extra provision is provided Garden Pits
-
Back filling has been done with right Backfill Materials
-
Stormwater connection to legal point of discharge is complete and inspected by council
-
Stormwater risers are provided at downpipe locations/Water Tank and Channel Grates
-
Stormwater provisions are made for rainwater tanks if tanks are required
-
Stormwater provisions are made for channel drains if available
-
Trash gates are installed if required in council endorsed drainage plans
-
Any drainage works carried out in tree protection zones has been inspected by Arborist
-
Any damages to assets such as crossover, foot path, nature stip, pit covers outside the site
-
Pits in driveway are covered and protected
-
Site clean (waste material and rubbish)
-
Are there any internal or external damages to the property?
-
Upload images to Folder Location: Construction Folder\Job Adress\06 Building Inspection\WU inspection\Drainage
Comments / Actions
-
Comments
-
Media
Sign Off
-
Supervisor Signature
-
Date and Time