Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • TBM has been marked by Land surveyor

  • Concrete follows the Approved slab plan for set out

  • Under slab insultations has been installed as per Plan

  • Minimum Brick Rebate height is 190mm set in framework

  • Deepen rebate provide as per final external ground finish level/ Clear direction to concretors

  • Starter bars for Retaining wall has been installed

  • All electrical and PLumbing Conduit are provided for island bench with Basin/Cook Top/Dish washer

  • External service conduits are installed in Slab area. (Gas, NBN)

SITE

  • Check site cut (R.L) and floor level (R.L) as per site plan

  • Does the actual site fall resemble contour markings on the site plan

  • Is the Set Out Correct as per set out plan

  • Is the founding material as per the soil report

  • Was rock encountered during excavations

  • Is Spoil removal required

  • Does the site require sub-surface drainage during construction

  • Has the crosser over and footpath been damaged

  • Does the Site Bin need to be emptied

SLAB

  • Are Bored Piers/ Screw Piles installed correctly and as per plan

  • Are all "Over All" measurements correct and as per plan

  • Are all bar chairs installed

  • Are all rebates correct and as per plan

  • Is additional binding required

  • Are all Pads screeded correctly and compacted

  • Is the slab correct thickness as per plan

  • Have all Hobs been accounted for

  • Is the garage step down correct? as per plan

  • Is the porch step down correct and as per plan

  • Are all starter bars installed and as per plan

  • Are all shower 40mm step downs installed?? as per Engineering

  • Have all slab step downs been check measured and are completed as per plan

  • Is a line pump required

  • Is a spotter required for slab pour

  • Is in slab insulation required

  • Is in slab hydronic heating required? and engineering reflecting this

  • Is the meter box installed as per plan? and power connection called up

Drains

  • Are all pit heights correct and as per plan

  • is the kitchen electrical conduit installed for island bench

  • Are all pits installed in the right locations as per civil plans

  • Have all drains been lagged

  • Are all stacks installed in correct locations

  • Has the Drain Camera check been completed? and all breaks rectified

  • Are there in drains installed along and inside the trenches

Retaining Walls

  • Are all retaining walls installed as per plan

  • Are all retaining walls installed at the correct height

  • Are there any additional retaining walls required

  • Have all retaining walls been waterproofed correctly and aggy pipes installed

  • Upload images for future reference

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.