Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
-
Check the brick colour from the C&M
-
Check the mortar Colour against the C&M (If It is Mortex colour, Special Mortar mix)
-
Brick return in Garage opening when every possible
-
Thickness of brick motor – 10 mm (+ - 3. mm)
-
Location Weep holes comply with NCC requirements. (Above DPC)-
-
Marked the external slab finish level
-
Damp proof Course
-
(a) 150mmabovetheadjacentfinishedground level; or
-
(b) 100 mm above sandy well-drained areas that extend to the full depth of the footing system; or
-
(c) 75 mm above the finished paved or concrete area; or
-
(d) 50 mm above finished paved or concreted area and protected from the direct effect of the weather by a carport, veranda,
-
Brick cavity Minimum 25 mm and maximum deviation from width of cavity is 15 mm Maximum.
-
Brick Overhang less than 15 mm. If anything, More than please provide information with management
-
Brick work vertical deviation with tolerance
-
2 mm maximum deviation (step) of any exposed brick surface
Comments
-
Comments
-
Media
Sign Off
-
Supervisor Signature
-
Date and Time