Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

Site Cut and Footings

  • Site cut has been completed, providing minimum 400mm clearance between ground and bottom of bearers?

  • Strip footings and pad footings are complete and in correct locations?

  • Pad footings are provided for any required brick piers?

  • If any bored piers required under stump holes, bored piers are poured lower enough to install stumps?

  • Miki pins are done to mark the corners of walls?

  • Footings are exposed and not covered with soil or mud?

  • Site preparation is complete for bricklayers to work safely?

Base Bricks

  • Overall dimensions of base brick walls are correct?

  • If base bricks are single skin brickwork with engaged piers, piers spacing is as per Engineering drawing?

  • Height of internal brick skin/piers are correct and match with bearer bottom level?

  • Opening is provided for stump hole drilling machine to drive in?

  • Access manhole provided?

  • Vents provided in required amount and in correct height?

  • Hoop iron tie downs are provided to tie down bearers?

  • Pockets provided in base bricks for steel columns to sit on strip footings?

Stumps and Subfloor Framing

  • Stump height match with brick/bearer bottom level?

  • Stumps are plumb and straight. Not leaning nor slanted?

  • Any visible cracks in stumps?

  • Stump spacing matches with required bearer span in Engineering drawing?

  • Concrete is not overpoured in stump holes. (Required concrete thickness is about 150mm)?

  • Stump holes are backfilled with dirt and ground within base bricks is levelled and free of debris?

  • Base bricks is completed within the opening left for machine access?

  • Brick piers are built under point load locations if required?

  • Termite barrier is installed on base bricks, piers and stumps?

  • Malthoid is provided under bearers?

  • Bearer size is correct?

  • If any bearers require lapping, correct lap length is provided and additional stumps provided as required?

  • If any joists require lapping, min 300mm lap or blocking at butt joints are provided?

  • Bearers have sufficient end bearing on base bricks?

  • Joist size is correct?

  • Joist spacing is correct?

  • If required, additional joists/joist thickening are provided under load bearing walls?

  • Any required steel beams are installed?

  • If under floor access is difficult in later stage, plumbing rough in is completed?

  • If under floor access is difficult in later stage, ducted heating rough in is completed?

  • If ducted heating is applicable, any heater units to be installed under the floor? If so, sufficient access is available?

  • If under floor access is difficult in later stage, under floor insulation is completed?

Comments / Actions

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.