Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • Check the brick colour from the C&M

  • Check the mortar Colour against the C&M (If It is Mortex colour, Special Mortar mix)

  • Brick return in Garage opening when every possible

  • Thickness of brick motor – 10 mm (+ - 3. mm)

  • Location Weep holes comply with NCC requirements. (Above DPC)-

  • Marked the external slab finish level

  • Damp proof Course

  • (a) 150mmabovetheadjacentfinishedground level; or

  • (b) 100 mm above sandy well-drained areas that extend to the full depth of the footing system; or

  • (c) 75 mm above the finished paved or concrete area; or

  • (d) 50 mm above finished paved or concreted area and protected from the direct effect of the weather by a carport, veranda,

  • Brick cavity Minimum 25 mm and maximum deviation from width of cavity is 15 mm Maximum.

  • Brick Overhang less than 15 mm. If anything, More than please provide information with management

  • Brick work vertical deviation with tolerance

  • 2 mm maximum deviation (step) of any exposed brick surface

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.