Information

  • Frontline / Reception Back Office / Emergency Preparedness

  • Prepared by Frontline Coordinator

  • Conducted on

Pool deck

  • Surface of pool surrounds clea, free from hazards and in good condition

  • Action Required

  • Responsible Person

  • Due Date

  • Lighting is adequate and all lights operational

  • Action Required

  • Responsible Person

  • Due Date

  • All handrails are in good condition

  • Action Required

  • Responsible Person

  • Due Date

  • Scum gutters and wet deck are in good condition (no broken bits)

  • Action Required

  • Responsible Person

  • Due Date

  • All electrical equipment being used is conjunction with and earth leakage protection device

  • Action Required

  • Responsible Person

  • Due Date

  • All equipment for public use is stored in boxes at the end of the pool

  • Action Required

  • Responsible Person

  • Due Date

Spa/Sauna

  • Floor and walls around the spa are free from mould

  • Action Required

  • Responsible Person

  • Due Date

  • Emergency stop button is operational

  • Action Required

  • Responsible Person

  • Due Date

  • Spa scum lines are clean

  • Action Required

  • Responsible Person

  • Due Date

  • No nails exposed through benches and all benches are secure

  • Action Required

  • Responsible Person

  • Due Date

  • Sauna in working condition (temperature at controlled reading)

  • Action Required

  • Responsible Person

  • Due Date

Boiler Room

  • No slip hazards, spills or visible leaks

  • Action Required

  • Responsible Person

  • Due Date

  • All boilers operating

  • Action Required

  • Responsible Person

  • Due Date

  • Lighting is adequate and all lights are operational

  • Action Required

  • Responsible Person

  • Due Date

Plant Room

  • Ozone and CO2 alarm operational

  • Action Required

  • Responsible Person

  • Due Date

  • Fire extinguisher and blanket tested

  • Action Required

  • Responsible Person

  • Due Date

  • Deluge shower and eyewash operational

  • Action Required

  • Responsible Person

  • Due Date

  • Lighting is adequate and all lights are operational

  • Action Required

  • Responsible Person

  • Due Date

  • No evidence of any leaks (hypo/pumps)

  • Action Required

  • Responsible Person

  • Due Date

  • PPE available and in good working condition

  • Action Required

  • Responsible Person

  • Due Date

Maintenance Shed

  • Lighting is adequate and all lights operational

  • Action Required

  • Responsible Person

  • Due Date

  • Portable power tools in good working condition

  • Action Required

  • Responsible Person

  • Due Date

  • Items stored off the ground where possible and no heavy items stored at height

  • Action Required

  • Responsible Person

  • Due Date

Chemical Shed

  • Fire blanket and extinguisher tagged

  • Action Required

  • Responsible Person

  • Due Date

  • PPE provided and in good working condition

  • Action Required

  • Responsible Person

  • Due Date

  • MSDS accessible and visible with chemicals

  • Action Required

  • Responsible Person

  • Due Date

  • All items stored appropriately with signage and chemicals clearly marked.

  • Action Required

  • Responsible Person

  • Due Date

Grassed/Public Area

  • Grass cut and area free from obstacles

  • Action Required

  • Responsible Person

  • Due Date

  • All rubbish bins have a lid and the area is free from litter

  • Action Required

  • Responsible Person

  • Due Date

Building

  • Access to roof is locked

  • Action Required

  • Responsible Person

  • Due Date

  • No damage to roof area- Handrails secure/gutters clear of debris

  • Action Required

  • Responsible Person

  • Due Date

  • Integrity of all internal gates and fencing

  • Action Required

  • Responsible Person

  • Due Date

  • All exterior security lighting operational

  • Action Required

  • Responsible Person

  • Due Date

First Aid Room

  • First Aid equipment neat and tidy and enough stock

  • Action Required

  • Responsible Person

  • Due Date

  • First aid bed clear and ready for use

  • Action Required

  • Responsible Person

  • Due Date

General Operations

  • Electrical equipment has been tested and tagged and is up to date

  • Action Required

  • Responsible Person

  • Due Date

  • Air conditioning/heating is functional in all areas

  • Action Required

  • Responsible Person

  • Due Date

Emergency Preparedness

  • All items stored appropriately - not blocking passageways, fire doors and exits.

  • Action Required

  • Responsible Person

  • Due Date

  • Emergency management plans in prominent position.

  • Action Required

  • Responsible Person

  • Due Date

  • Emergency warning systems audible in area.

  • Action Required

  • Responsible Person

  • Due Date

  • Fire extinguishers properly located, signed and checked.

  • Action Required

  • Responsible Person

  • Due Date

  • New employees and current employees have been introduced to Emergency Action plan and have attended training.

  • Action Required

  • Responsible Person

  • Due Date

First Aid Kit - Lifeguards

  • First Aid information book

  • Disposable latex gloves and an approved resuscitation mask for infection control

  • at least 3 sterile plastic bags for ice packs or dirty dressings

  • Pencil and notepad to record details or messages

  • One pair of rust resistant pointed forceps for removing splinters and stings

  • One pair of rust resistant scissors about 100mm long with one blunt point to cut dressings and bandages

  • At least 5 safety pins about 40mm long to hold bandages in place

  • 2 triangular bandages with at least 900mm edge length each to use as slings or dressings

  • 3 rolls of stretch bandage (50, 75, 100mm wide and at least 1.5m long) to hold dressings in place and support injured limbs

  • 3 sterile wound dressings to help control bleeding by applying pressure

  • 2 sterile individually packed non adhesive dry dressings 100x100mm to use for cuts, abrasions, lacerations and weeping wounds

  • 1 roll of low allergnic adhesive strapping at least 25m wide x 2.5m long to hold dressings in place

  • 24 sterile adhesive dressing strips in assorted widths to cover small cuts/blisters and abrasions

  • At least 3 disposable hand towels or tissues for general cleaning other than wounds

  • At least 9 sterile cotton gauze swabs for cleaning wounds

  • Responsible Person

  • Due Date

  • Evac Packs fully equipped.

  • Action Required

  • Responsible Person

  • Due Date

Office Area

  • Lighting adequate and operational

  • Action Required

  • Responsible Person

  • Due Date

  • Split system operational

  • Action Required

  • Responsible Person

  • Due Date

  • Items stored correctly (no heavy items at height)

  • Action Required

  • Responsible Person

  • Due Date

  • Floor space even and free from wear, obstacles and rubbish

  • Action Required

  • Responsible Person

  • Due Date

  • Sign when completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.