Information

  • Client / Site

  • Location
  • Conducted on

  • Prepared by

  • Supervisor inspection

  • DA-ZH-FM116.2

PEOPLE

  • 1. Persons wearing correct PPE

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 2. Persons engaged in regular safety discussion (pre-start meetings/ toolbox talks)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 3. Persons properly inducted, including adequate site-specific induction

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 4. Persons can describe site hazards, evacuation and first aid procedures

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 5. Persons can describe course of action if a hazard is identified or job/task is unsafe

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 6. Contractors authorised to work on site (i.e. Authority to Work Permit)

  • Has the risk been controlled?

  • Action taken / Lessons learned

PLANT & VEHICLES

  • 1. Plant subject to regular inspection (documented) - Daily Plant Check Sheets for Mobile Plant

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 2. Plant is fit for purpose, including adequate maintenance, cleaning, guarding, and warning systems (e.g. reversing alarms, flashing lights etc)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 3. Operators properly trained, licensed and competent

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 4. Traffic Management Plan in place (documented) – Controls in place as per plan

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 5. Reversing kept to an absolute minimum and spotters used correctly

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 6. Persons on foot maintain a safe distance from moving vehicles and plant

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 7. Safe speed maintained (brisk walking pace when around persons on foot)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 8. Safe area established for onsite cleaning of plant & vehicles

  • Has the risk been controlled?

  • Action taken / Lessons learned

PROCESS & HOUSEKEEPING

  • 1. Site risks identified, controlled and regularly reviewed (documented evidence)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 2. Safe Work Method Statements (SWMS) and MSDSs available on site and kept up-to-date

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 3. Unsafe plant/equipment tagged out

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 4. Isolation, lock-out and tag-out applied during maintenance and repairs

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 5. Electrical equipment tagged, tested and fit for purpose

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 6. Emergency equipment available and serviced (e.g. fire, first aid & spill equipment)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 7. Manual handling adequately controlled (e.g. lifting aids, techniques, job rotation etc)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 8. Overhead and underground services identified and controlled

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 9. Chemicals and Dangerous Goods correctly used, labelled and stored

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 10. Permits issued for Hot Work, Confined Space Entry and Excavation/Trenching

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 11. General housekeeping maintained to an acceptable standard

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 12. Worksite amenities adequate (e.g. drinking water, toilets, shelter etc)

  • Has the risk been controlled?

  • Action taken / Lessons learned

ENVIRONMENT

  • 1. Adequate collection and disposal of waste

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 2. Noise levels reduced as far as possible

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 3. Prevention of spills/leaks (e.g. bunding of drums, tanks and wash bay facilities)

  • Has the risk been controlled?

  • Action taken / Lessons learned

  • 4. Impacts on native vegetation, wildlife habitat and aboriginal heritage minimised

  • Has the risk been controlled?

  • Action taken / Lessons learned

SAFE BEHAVIOURAL OBSERVATIONS & UNSAFE CONDITIONS

  • 1. BEHAVIOUR (Choose one)

  • DETAILS

  • COMMENTS

  • Action taken / Lessons learned

  • Has the risk been controlled?

  • 2. BEHAVIOUR (Choose one)

  • DETAILS

  • COMMENTS

  • Action taken / Lessons learned

  • Has the risk been controlled?

ASSESS THE RISK

  • What would a reasonably foreseeable outcome be if an incident occurred?

  • Consequence

  • Likelyhood

  • Risk Rating

CONTROL THE RISK

  • Has the hazard been controlled?

  • Further action required / Learning shared:

ACTIONS:

  • Name of person reporting this event:

  • Enter Position

  • Please complete section below and highlight any additional observations and actions

  • Please add photo if required

  • Please sketch diagram if required

APPROVAL / MANAGEMENT REVIEW

  • Manager to review & approve, or send for further investigation:

  • Additional actions and Learnings shared

  • Management Approval:

  • Distribution: (1) Project Manager (2) ZH Administrator (3) Zero Harm Advisor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.