Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final checks.
-
Have you gas tested for a minimum of five minutes?
-
Is the gas meter at least 1m away from an appliance or an openable window?
-
Is the gas meter positioned clear of a downpipe?
-
Is there an LPG bottle set up on this property, and if so, have all clearances been met?
-
Is the rough in pressurised?
-
Have you bucket tested for five minutes at 1500kpa?
-
Is all pipework clear of the manhole and exhaust fans?
-
Is all pipework neatly clipped including the runs under windows and doorways?
-
Are all garden taps, appliances and ORG clear of any downpipe?
-
Are all crossovers between hot and cold pipes silicones?
-
Have you check that no metal bracing is touching pipe work at all?
-
Have you checked every fixture for cross connections?
-
Are all noggins secure and free from movement?
-
Are all lugged elbows and tap sets screwed back securely and free from any movement?
-
Are all noggins set back at 40mm?
-
Is all pipework in tight against the frame and not bulging out into the cavity?
-
Has the water lead in been lagged with armaflex and clipped where it is checked into the rebate?
-
Have the solar panels been installed and the flow and return lines connected?
-
Has the sensor wire been run and tied off to a roof truss to protect the terminal joint?
-
Are all flow and return lines strait, clipped and armaflex joins taped neatly with black duct tape?
-
Are all flow and return lines clear of touching any plastic pipes or wiring?
-
Have all wastes been cut off neatly and in pipe reducers fitted?
-
Has the vent been run at the opposite end of the sewer point, ensuring that there are no unvented branches exceeding 10m?
-
Has the vent been flashed?
-
Is there 300mm separation between the recycled and mains where they roll over into the house?
-
Are all recycled and mains water pipes at least 100mm apart when ran parallel to each other?
-
Are all crossovers between recycled and mains at right angles?
-
Are all recycled tap provisions a 5/8mi x 150mm extended lugged elbow?
-
Is the recycled line looped and under pressure?
-
Is the rough in ready for the R1 & R2 PIC inspections?
-
Have you looped the tank line and the rainwater line is now under pressure?
-
Have you checked the plans & job cards for any extra inclusions?
-
Has all rubbish been picked up, placed in a bin provided and secured so it does not blow away?
-
Have all external windows and doors been locked?
-
Has the site been left in a safe state with all site fences closed?
-
Notes-
-
Add media
-
Is this job ready for the next stage?
-
I have checked all the above items and the work has been done to a satisfactory standard.