  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Final checks.

  • Have you gas tested for a minimum of five minutes?

  • Are all appliances connected and operational?

  • Have you bled all the air from the HWS via the bath?

  • Have you bled all the air from the solar panels as per manufacturers instructions?

  • Have you checked for leaks on the flow and return lines and panels?

  • Is there an appropriate tempering valve fitted to the HWS?

  • Is the tempering valve turned up to full?

  • If the unit is a Chromagen, is there a factory fitted brass check valve fitted to the cold water inlet?

  • Is the HWS installed on a level base, above ground level and secured back to the wall?

  • Have you tested and confirmed that there are no cross connections?

  • Have all fixtures been tested thoroughly and checked for leaks?

  • Has the hotplate gas connection been run to allow enough room not to foul the oven when installed?

  • Is the gas regulator in an accessible position?

  • Is the hotplate securely mounted?

  • Have the safety chains been fitted to the free standing oven?

  • Have you installed the spa pump and tested it?

  • Has the brickwork been patched neatly around the spa pipes?

  • Have you tested the rainwater tank and pump for leaks?

  • Is the water tank installed on the correct base and level?

  • Has the pressure pump been installed and dynabolted to the concrete slab?

  • Are all toilets and external taps working now that you have installed the tank to toilet system?

  • Is the dishwasher installed level and secure?

  • Does the dishwasher waste loop up under the benchtop before connecting to the nipple to protect against backflow?

  • Have you left all warranty cards, instructions and operation manuals in the cutlery drawer?

  • All pipe work that passes through cabinets & shelves have cover plates been installed to cover all holes?

  • Is there a 500kpa boundary limiting valve fitted to the water meter?

  • Have you checked the plans & job cards for any extra inclusions?

  • Has all rubbish been picked up, placed in a bin provided and secured so it does not blow away?

  • Have all external windows and doors been locked?

  • Has the site been left in a safe state with all site fences closed?

  • Notes-

  • Add media

  • Is this job ready for the next stage?

  • I have checked all the above items and the work has been done to a satisfactory standard.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.