  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Have you filled out the Proplumb Risk Assessment form?

Onsite Checks.

  • Is the site free from damage or vandalism?

  • Have you checked that the north arrow on the plan is correct?

  • Is the solar panels installed between 70deg West & 50deg east of north?

  • Will the solar panels be free from shade between 9am and 4pm?

  • Will the solar panels have a minimum inclination of 10 deg? (roof pitch)

  • Is the spouting free of dents and scratches where you have been working?

  • Have you installed the solar panels in the exact location on plan?

  • Has TOT/Mirror paste been used on all brass olive joints and tightened sufficiently?

  • Are all Z brackets tightened to rail and secured through panel?

  • Have you opened the bleed valve cap 2 full turns?

  • Has the correct armor flex been used on all flow and return lines?

  • Is the roof free of mud, debris, offcuts, etc?

  • Have you checked that all damaged roof tiles have been replaced and that the roof is watertight?

  • Is there any spare roof tiles left on site after you have replaced the damaged tiles?

  • Has the sensor wire been run and tied off to a roof truss to protect the terminal joint?

  • Are all armor flex lines strait, clipped and armor flex joins taped neatly with black duct tape?

  • Have you checked that the flow and return lines do not pass through a man hole or over an exhaust fan?

  • Is all pipework in tight against the frame and not bulging out into the cavity?

  • Have you positioned the flow and return lines out the wall in accordance to the manufacturers or particular builders requirements?

  • Are all flow and return lines clear of touching any plastic pipework or wiring?

  • Have you pressurised the the entire solar system including flow and return lines?

  • Have you drained the system after testing?

  • Has the UV rated armor flex been left long and taped back on its self to cover any sharp edges?

  • Has the sensor wire been ran out with the flow line and taped off in a bundle?

  • Has all rubbish been disposed of as per builders specific requirements?

  • The above information is true and correct.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.