Title Page
-
Conducted on
-
Prepared by
-
Location
-
Ceilings neatly sheeted & screwed up correctly
-
External walls / partitions neatly sheeted and screwed up correctly
-
Plasterboard finish correct to shower trays
-
All wet areas have been sheeted with M/R plasterboard
-
Window cills fitted correctly
-
Window ingles fitted & square
-
All cables brought through ceiling
-
All pads in partitions have been fitted
-
Pipechases double sheeted and square
-
Access hatches cut from pipe chase and fully sheeted behind
-
Tank stool built with flooring fitted
-
Meterboard has been fitted
-
All stairwell protection has been refitted
-
All excess material removed and plot swept
Supervisor signature
-
Add signature
Site manager signature
-
Add signature