Title Page

  • Conducted on

  • Prepared by

  • Location
  • Ceilings neatly sheeted & screwed up correctly

  • External walls / partitions neatly sheeted and screwed up correctly

  • Plasterboard finish correct to shower trays

  • All wet areas have been sheeted with M/R plasterboard

  • Window cills fitted correctly

  • Window ingles fitted & square

  • All cables brought through ceiling

  • All pads in partitions have been fitted

  • Pipechases double sheeted and square

  • Access hatches cut from pipe chase and fully sheeted behind

  • Tank stool built with flooring fitted

  • Meterboard has been fitted

  • All stairwell protection has been refitted

  • All excess material removed and plot swept

Supervisor signature

  • Add signature

Site manager signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.