Title Page
-
Conducted on
-
For passage from/to:
-
Location
Stowing the Bow
-
For long passages empty Castoldi lockers and place inside Forepeak.
-
Secure any loose items in Forepeak.
-
Move kayaks to SDF and strap down on Sun Loungers.
-
Put extra ratchets on Jetski.
-
Put extra ratchets on Rescue Tender.
-
Put extra ratchets on Castoldi.
-
Is the crane up in navigational position and stays have been put on?
-
Secure anchor station and prep for sea.
Stowing Sundeck
-
undefined
-
SDA Bunny Pad & SDF Sun Lounger cushions have been moved to BD Salon.
-
Rest of SD cushions have been placed in steam room and BC shower.
-
Secure cover for forward Sun Lounger.
-
Close sliding glass doors and secure handles.
-
Put Sundeck plants behind bar.
-
Put Sundeck bar stools in Beach Club.
-
Move couches to either side of the bar. With a towel as protection between bar and couch.
-
Peloton secured by SD bar
-
Black Tarp has been placed over both Cabinets.
-
Microfibers and soft padding has been put between ratchets and furniture.
Stowing Bridge Deck
-
Cushions removed and placed inside BD Salon.
-
Furniture moved in place as per stowing photos.
-
Plants secured along with furniture.
-
Place microfibes and soft padding between ratchets and furniture.
Stowing Main Deck
-
Side boarding ladder rails have been moved to Beach Club for long passages?
-
Cushions have been moved to Master Cabin.
-
Move furniture into place as per stowing photos.
Stowing Beach Club
-
Place Dri-Decking on teak.
-
Make sure all cushions are protected and kept dry.
-
Ask Engineers to switch off Steam Room breaker before putting cushions inside
-
Secure all items in Watersport Store.
-
Secure Beach Club door from inside.
-
Put Seabobs into cargo mode.