Title Page

  • Conducted on

  • Checked by

  • Annual Inspection Sheet for YYYY

MANUAL CALL POINT TEST

  • Total number of MCPs on board: 27

  • - Visual inspection of unit, glass cover still intact

  • - Inform Engineers and all crew of MCP test as this will set off the fire alarm and close fire doors

  • - Take black MCP key from CO. Insert into unit and pull front red cover plastic down to activate the alarm

  • - Silence the alarm from the Fire Panel on the Bridge

Manual Call Points

JANUARY

  • Bridge Port

  • Bridge Starboard

FEBRUARY

  • Captain's Cabin Starboard

  • BD Pantry to Salon Entrance

MARCH

  • Bridge Salon

  • Bridge Guest Foyer Forward

  • Bridge Deck Guest Foyer Aft

APRIL

  • Master Office

  • Master Cabin Emergency Escape

MAY

  • Main Deck Guest Foyer

  • Main Salon Starboard Forward

  • Main Salon Port Aft

JUNE

  • Lower Guest Foyer Forward

  • Lower Guest Foyer Aft

JULY

  • Main Deck Crew Entrance

  • Main Deck Crew Stairs

AUGUST

  • Crew Corridor Aft

  • Engine Room Center

SEPTEMBER

  • Crew Corridor Forward

  • Bow Thruster Room

OCTOBER

  • Main Deck Port Mid Emergency Escape

  • Main Deck Port Aft Guest Emergency Escape

NOVEMBER

  • Emergency Generator Room

  • Foredeck Tech Space Aft of Rescue Tender

  • Forepeak

DECEMBER

  • Beach Club Port Tech Space

  • Beach Club Port Aft

Sign Off

  • Once all checks have been completed, please sign below

  • Additional Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.