Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Acoustic Louvres

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Primary Structure handover complete.

  • Personnel

Support Grid

  • Have the 3mm galv supporting angles been installed in accordance with the details. Tec fixings into primary steel at 600mm centres?

  • Personnel

  • Have short top hats been fixed to primary structure with 4nr tec fixings (2 each side)?

  • Personnel

  • Have the a minimum of 1nr bulbtite rivet been utilised to fix from top hat/angle into back of the louvre cassette?

  • Personnel

Louvre Cassettes

  • Are the louvre cassettes correctly sized and un-damaged?

  • Personnel

  • Are the cassettes lined through with adjacent modules and corner/column capping installed?

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.