Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Acoustic Louvres
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Primary Structure handover complete.
-
Personnel
- Installer
- A2O
Support Grid
-
Have the 3mm galv supporting angles been installed in accordance with the details. Tec fixings into primary steel at 600mm centres?
-
Personnel
- Installer
- A2O
-
Have short top hats been fixed to primary structure with 4nr tec fixings (2 each side)?
-
Personnel
- Installer
- A2O
-
Have the a minimum of 1nr bulbtite rivet been utilised to fix from top hat/angle into back of the louvre cassette?
-
Personnel
- Installer
- A2O
Louvre Cassettes
-
Are the louvre cassettes correctly sized and un-damaged?
-
Personnel
- Installer
- A2O
-
Are the cassettes lined through with adjacent modules and corner/column capping installed?
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: