Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Aluminium Rainscreen

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Has concrete frame been handed over to 2O ready for us to Commence.

  • Personnel

Membrane

  • Tyvek Fire Curb Membrane installed as per Manufacturers installation guidelines and A2O Details

  • Personnel

  • Any Tears or splits repaired and fully taped min 100mm overlap.

  • Personnel

Support Grid

  • Helping Hand Brackets Fixed into Concrete using Correct Fixings as per A2O Fixing schedule and A2O Drawings, Ensure Correct fixing patterns are adhered to at all Times .

  • Personnel

  • Ensure all Fixed and sliding point brackets are spaced vertically/horizontally and fixed in accordance with A2O Setting out drawings.

  • Personnel

  • Sotech Rails are fixed to fixed point brackets using Correct fixings specified on Fixing Schedule and in accordance with A2O Details.

  • Personnel

  • Sotech Rails are fixed to Sliding point brackets using Correct fixings specified on Fixing Schedule and in accordance with A2O Details.

  • Personnel

Rainscreen Background

  • 75mm rockwool duo - slab installed as per Manufacturers installation guides and as per A2O Details. Ensure correct fixing Pattern is used.

  • Personnel

  • Siderise Horizontal fire barriers are installed as per Manufacturers Guidelines and A2O details, Ensure the correct fixings are used as per A2O Fixing schedule and that they are fully none combustible. Ensure all Brackets are set out to the correct centres specified.

  • Personnel

  • Siderise Vertical fire barriers are installed as per Manufacturers Guidelines and A2O details, Ensure the correct fixings are used as per A2O Fixing schedule and that they are fully none combustible. Ensure all Brackets are set out to the correct Centres Specified.

  • Personnel

Sotech Casettes

  • Sotech cassette panels installed as per Sotech Manufacturers installation Guide and A2O Layout drawings.

  • Personnel

  • Cover flashings installed as per A2O working drawings and materials checked for damage / interfaces to be correct.

  • Personnel

Completion

  • Epdm installation to suit A2O drawings and manufacturer specifications

undefined

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.