Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Aluminium Rainscreen

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Has SFS QA been completed?

  • Personnel

Membrane

  • Tremco Illbrook Me010 breather membrane sealed back to Y wall board.

  • Personnel

  • Tears and splits repaired and fully taped min 100mm overlap.

  • Personnel

Support Grid

  • 35mm top hats fixed at 600mm centres.

  • Personnel

  • Fixed and sliding point brackets spaced vertically/horizontally and fixing arrangement in accordance with working drawings using stainless steel tek fixings.

  • Personnel

  • Vertical T/L's positively fixed to fixed point brackets using stainless steel rivet/tek fixings.

  • Personnel

  • Vertical T/L's fixed to sliding point brackets through slotted holes to facilitate movement.

  • Personnel

Rainscreen Background

  • 75mm rockwool duo - slab installed with centre fixed metal washer and top and bottom plastic washers overlapping slabs. Slabs to be neatly cut and touching to allow fibres to bond.

  • Personnel

  • Siderise vertical fire barriers installed as per A2O working drawings with compression to back face of aluminium panels. Compression to not be compromised by fire barrier brackets.

  • Personnel

  • Siderise horizontal fire barriers installed as per A2O working drawings with 25mm expansion allowed to back face of aluminium panels.

  • Personnel

Sotech Casettes

  • Sotech cassette panels installed as per A2O working drawings hangers positively engaged to cladding rail.

  • Personnel

  • Cover flashings installed as per A2O working drawings and materials checked for damage / interfaces to be correct.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.