Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Brick tie channels
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
SFS area + QA complete.
-
Personnel
- Installer
- A2O
Tyvek, K15 + Ancon brick tie channels
-
Tyvek Housewrap installed horizontally with joints taped using Tyvek tape. Overlap of 100mm horizontally and 150 vertically. Any tears / rips repaired with 100mm overlap.
-
Personnel
- Installer
- A2O
-
K 15 50mm insulation installed using 10nr fixings per full board. 8nr plastic washers and 2nr fire rated metal washers per full board.
-
Personnel
-
All joints of K15 taped using silver tape at least 75mm wide.
-
Personnel
- Installer
- A2O
-
Ancon brick tie channels installed using ancon supplied fixings at 600mm centres (SFS stud locations) into SFS studs at 450mm centres vertically
-
Personnel
Additional / bespoke items
-
Additional / bespoke items
Completion
-
Installer Signature:
-
A2O Signature:
-