Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Built-up Roof

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Primary structure handover complete.

  • Personnel

Storage

  • Store the board material in dry protected conditions, never stacked more than two pallets high.

  • Personnel

Installation Checks

  • Liner panels to be fixed in every corrugation @ eaves, Ridge & Joint location & 3nr. intermediately.

  • Personnel

  • Foam fillers to be installed @ eaves & ridge and mastic sealed for air tightness.

  • Personnel

  • Spacer Bar system to be correctly interlocked & fixed @ no more than 1M centres or as system specification.

  • Personnel

  • Liner panels to have polyband or similar to side laps and mastic seal to end laps.

  • Personnel

  • Insulation to be laid continuously with no gaps, to ensure correct thermal qualities.

  • Personnel

  • Eaves closure flashing to be mastic sealed & have minimum of 1nr fixing into face.

  • Personnel

  • Outer sheet to be fixed on every corrugation @eave, ridge & panel jointlines +3nr intermediates.

  • Personnel

  • Side laps to be stitched @450c/l on main sheet and 300 c/l for Rooflights.

  • Personnel

  • Rooflight fixings to have oversized washers to liner & Poppy Red fixings to outer sheet.

  • Personnel

  • Ridge to be sealed with 2nr runs of mastic. Ridge fillers to be set back 80mm.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.