Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Capping
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
VCL
-
VCL waterproof membrane installed, joints silicone and taped.
-
Personnel
- Installer
- A2O
-
40mm prisma strips to the front and the back at correct centres to hold VCL.
-
Personnel
- Installer
- A2O
Capping
-
Top hats installed at correct centres with correct fixing type.
-
Personnel
- Installer
- A2O
-
Z brackets installed at correct centres with correct fixing type.
-
Personnel
- Installer
- A2O
-
Capping installed as per plan drawings. Fixing type and centres correct, joints of cappings correct.
-
Personnel
- Installer
- A2O
-
Connecting capping butt straps to be siliconed.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: