Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Capping

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

VCL

  • VCL waterproof membrane installed, joints silicone and taped.

  • Personnel

  • 40mm prisma strips to the front and the back at correct centres to hold VCL.

  • Personnel

Capping

  • Top hats installed at correct centres with correct fixing type.

  • Personnel

  • Z brackets installed at correct centres with correct fixing type.

  • Personnel

  • Capping installed as per plan drawings. Fixing type and centres correct, joints of cappings correct.

  • Personnel

  • Connecting capping butt straps to be siliconed.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.