    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Generix Stone

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

Generix Stone

  • Module end handed over to A2O by Kier<br> - Area to free of other trades, concrete upstand finished and sealed.

  • Personnel

Hold point sign off

  • A2O manager

  • Brackets are fixed as per latest drawings with thermal pad if required with the correct type/number of fixings.

  • Personnel

  • Cills to be level and at the required height, as per latest drawings, with the correct type / number of fixings.

  • Personnel

  • Insulation to be 2x 100mm layers, 10 fixings per full board required, middle fixings to be S/S and perimeter plastic, fixing arrangement as per comments, all joints to be sealed with tape with no gaps, back void of horizontal top hat to be filled with 20mm thick insulation.

  • Personnel

  • T rails to be installed as per latest drawings, with correct number / type of fixings. Sliding point and fixed point locations to be followed as per A2O subgrid drawings.

  • Personnel

  • Anti rattle gasket / tape is continuous and positioned on both outer edges.

  • Personnel

  • Ensure bottom/intermediate and top supports are positioned in the correct place and as per latest drawings. Fixings to support as per spec.

  • Personnel

Hold point sign off

  • A2O manager

  • TN76 adhesive is applied to the vertical T rails at 100mmx40mmx12mm as per CWCT spec. This should line through with the centre of the stone.

  • Personnel

  • Ensure that the stone is free from damage and the gaps are consistent and correct.

  • Personnel

Hold point sign off

  • A2O manager

  • Ensure surfaces are free from dirt before anti graffiti solution applied. Check 3 coats have been applied and that full coverage has been achieved.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.