Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Lego
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Drawings
-
Have construction issue drawings been issued and on site? Have operatives / supervisors comprehended drawings alongside A2O designer or manager?
-
Personnel
- Installer
- A2O
Delivery / Materials
-
Materials delivered to site undamaged and in good condition
-
Personnel
- Installer
- A2O
-
Material delivery notes checked against procurement schedules / A2O orders
-
Personnel
- Installer
- A2O
Installation
-
Training records / Lego installation competencies checked and all installers are approved Lego installers.
-
Personnel
-
Critical 1 - Choose any numbered page
-
Personnel
- Installer
- A2O
-
Critical 2 - Choose any numbered page
-
Personnel
- Installer
- A2O
-
All bricks fully engaged with each other in the correct pattern as per working Lego drawings.
-
Personnel
- Installer
- A2O
Handover
-
Detailing / finish bricks installed and undamaged as per drawings.
-
Personnel
- Installer
- A2O
-
Lego construction snagged, de-snagged and accepted by client.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: