Before Start-Up
-
Instructions:
1. Choose the day of inspection.
2. Answer "Pass" if it is compliant, "Fail" if it is non-compliant or "N/A" for the questions provided.
3. Add any photos and notes for the comments and maintenance requirement by clicking on the paperclip icon.
4. To add a Corrective Measure, click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
5. Complete audit by providing digital signature. -
Day of Inspection
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Date / Time
-
Project Name / Address
Before Start-Up
-
Vehicle Name
-
Machine Number
-
Total daily operating hours
-
Operator’s manual read & understand
-
Fluid levels – oils / water / air
-
Record number of litres added
-
Damage to machine/guards/body
-
Tyres/tracks /pressures okay
-
Warning Lights
-
Warning/safety signs visible
-
Area safe to operate plant (walk around)
-
Windows/mirrors clean, wipers operational
-
Is Plant safe to operate?
-
Please advise Supervisor IMMEDIATELY
-
Please proceed to the next section.
After Start-Up
After Start-Up
-
Gauges/lamps/warning systems
-
Lights – front/rear/stop/indicators/beacons
-
Horns/reversing alarm
-
Throttle operation
-
Operate controls – functioning properly
-
Brakes – park/foot/retarder/emergency
-
Steering/suspension
-
Certified operator's signature