Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Quadcore Karrier Panel

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Cladding rails complete and handed over to A2O

  • Personnel

Seals/Gaskets/Bearers

  • Base flashing detail installed in accordance with A2O drawings.

  • Personnel

  • Gaskets and seals installed in accordance with A2O drawings.

  • Personnel

  • Support galv angles and cleaders installed in accordance with A2O drawings.

  • Personnel

Sub-Straight

  • Check gridlines are in accordance with construction issue information and datums have been provide by site engineer.

  • Personnel

Panels

  • Check that panels are un-damaged as they are removed from pallets and that there is no significant colour variation.

  • Personnel

  • Panels are properly engaged into each other and vertical joints aligned with adjacent panels.

  • Personnel

  • Fire mastic applied to panel joints and stitcher screws as indicated on A2O working drawings.

  • Personnel

  • Panels fixed to cladding rails at head in accordance with A2O drawings.

  • Personnel

  • Any gaps between panel joints to be fully packed with gun grade foam infill.

  • Personnel

Flashings/joint gaskets

  • Face flashings installed in accordance with A2O drawings.

  • Personnel

  • Head/jamb flashings installed and sealed in accordance with A2O drawings.

  • Personnel

  • Profiled butt straps present at flashing joints.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.