Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Topdek
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Topdek
-
Check that area is ready for installation.
-
Personnel
- Installer
- A2O
-
Check that Topdek panels have been delivered undamaged.
-
Personnel
- Installer
- A2O
-
Check that area is air sealed by others.
-
Personnel
- Installer
- A2O
-
Check fixings in accordance with drawings.
-
Personnel
- Installer
- A2O
-
Check that that dark grey face of panels is showing externally.
-
Personnel
- Installer
- A2O
-
Check fixing centres.
-
Personnel
- Installer
- A2O
-
Check vertical solvent welded joints.
-
Personnel
- Installer
- A2O
-
Check foam filler in place.
-
Personnel
- Installer
- A2O
-
Check Trocal metal top angle is fixed at correct centres.
-
Personnel
- Installer
- A2O
-
Check membrane strip fitted correctly at top of panel.
-
Personnel
- Installer
- A2O
-
Check drip flashing fixed at correct centres.
-
Personnel
- Installer
- A2O
-
Check cill membrane strip is sealed correctly.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: