Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Trespa Mechanical Fix onto Benchmark Panel
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Offload and Storage
-
Panels carefully offloaded and inspected for damage. Any damage immediately reported to line manager.
-
Personnel
- Installer
- A2O
-
Trespa stacked on a level area to avoid warping and protected from site damage.
-
Personnel
- Installer
- A2O
Sub-straight
-
Check panel installation is complete and ready for timber. Check QA completed. <br>
-
Personnel
- Installer
- A2O
Flashings
-
Base and perimeter flashings installed and sealed.
-
Personnel
- Installer
- A2O
Trespa TS200 installation
-
NV3 support rails fixed back to benchmark panel using correct spacing of fablock fixings. Benchmark pvc tape installed behind all rails. <br>
-
Personnel
- Installer
- A2O
-
Adjustable and standard clasps fixed to back of trespa panels using pst fixings in accordance with A2O drawings. <br>
-
Personnel
- Installer
- A2O
-
Fire barriers installed if required in accordance with design specification. [photographs taken prior to installation of finish panels] <br>
-
Personnel
- Installer
- A2O
-
Panels mounted onto NV3 rails and adjusted for line and level and positively fixed at head clasps.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: