Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Siderise Firebarrier

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

Siderise fire barrier materials

  • Fire barrier schedule is available<br>within the site documentation

  • Personnel

  • Fire barrier materials have been<br>checked on delivery to site to be<br>correct type and specification in<br>accordance with the A2O fire barrier<br>schedule

  • Personnel

  • Fire barrier materials have been<br>stored on site in an appropriate<br>manned in accordance with<br>manufacturers recommendation.<br>"Keep material in original packaging<br>until it is to be used. Store material<br>to protect against<br>damage including the weather"

  • Personnel

  • All fire barrier brackets, fixings and<br>tape has been delivered to site and<br>checked that they are in accordance<br>with the A2O fire barrier schedule<br>and manufacturers specification.

  • Personnel

Pre-installation

  • A site meeting with fire barrier<br>supplier [Siderise] arranged and<br>carried out in advance of installation<br>works commencing. To include any<br>training that may be required.

  • Personnel

  • A2O Fire barrier construction<br>drawing are on site within the A2O<br>drawing file.

  • Personnel

  • All installation operatives have been<br>briefed on the specific installation of<br>the fire barriers to be installed, in<br>accordance with manufacturers<br>recommendation

  • Personnel

Vertical barrier installation

  • Check fire barrier locations are in<br>accordance with A2O fire barrier<br>setting out construction drawings.

  • Personnel

  • At each fire barrier location, check<br>that thickness of fire barrier is in<br>accordance with cavity void plus<br>compression allowance in<br>accordance with the manufacturers<br>specification.

  • Personnel

  • If the fire barrier to be installed<br>requires to be cut to size, make sure<br>that the cut allows for the extra size<br>to ensure the required compression<br>and be sure to cut in the direction<br>that is marked on the foil facing to<br>maintain compression in accordance<br>with manufacturers specification.

  • Personnel

  • Manually fold the installation<br>brackets to allow the correct<br>embedment into the fire barrier. This<br>needs to be 75% of the depth of the<br>fire bracket to ensure a compression<br>zone within each barrier, i.e. if the<br>cut fire barrier is 100mm, the bracket<br>would penetrate the barrier 75mm.

  • Personnel

  • Bracket fixings are fixed at 600mm<br>centres with non combustible fixings<br>[no plastic or rubber washers].<br>Ensure fixings are as per A2O or<br>manufacturers specification.

  • Personnel

  • Ensure that the fire barrier is tightly<br>abutted to the barriers to each side<br>and seal the joints with RFT 120 x 45<br>foil tape.

  • Personnel

Horizontal barrier installation

  • Ensure that horizontal barriers are<br>installed after vertical barriers.

  • Personnel

  • Check fire barrier locations are in<br>accordance with A2O fire barrier<br>setting out construction drawings.

  • Personnel

  • At each fire barrier location, check<br>that thickness of fire barrier is in<br>accordance with cavity void and<br>allow a 25mm air flow gap between<br>the fire barrier front edge and the<br>rear face of the cladding panel. in<br>accordance with the manufacturers<br>specification.

  • Personnel

  • If the horizontal fire barrier to be<br>installed requires to be cut to size,<br>make sure that you cut the rear<br>edge of the barrier in accordance<br>with manufacturers specification.

  • Personnel

  • Manually fold RH installation<br>brackets 90 degrees at a point to<br>allow the correct embedment into<br>the fire barrier. This needs to be<br>long enough to allow the split end of<br>the bracket to protrude from the<br>barrier front face.

  • Personnel

  • RH Bracket fixings are fixed at<br>400mm centres with non<br>combustible fixings [no plastic or<br>rubber washers]. Ensure fixings are<br>as per A2O and manufacturers<br>specification. [3 x brackets per<br>1200m barrier length]

  • Personnel

  • Ensure that the fire barrier is tightly<br>abutted to the barriers to each side<br>and seal the joints with RFT 120 x 45<br>foil tape.

  • Personnel

  • Arrange inspection by Siderise before commencing with any further cladding finishes.

  • On completion of inspection, cavity<br>fire barriers are to be signed off by a<br>Siderise approved qualified person.

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.