Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
A2O - Composite roof-lights
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Existing sheets
-
All existing mastic cleaned from remaining roof sheets
-
Personnel
- Installer
- A2O
Rooflight over panel endlap detail
-
50mm x 8mm butyl tape with PE foam co laminate centre applied 10mm from the top edge of the KS100RW sheet.<br>
-
Personnel
-
4no. Poppy red stainless steel self drilling self-tapping primary fixings with minimum 16mm diameter non-ferrous EPDM backed washer. 9no. KR-VRT-SS-30 poppy red 6.3mm diameter x 30mm long stainless steel stitching screw with 19mm diameter washer.
-
-
All fixings to be in line 30mm up from the edge of the rooflight cutback
-
Rooflight over rooflight lap detail
-
50mm x 8mm butyl tape with PE foam co laminate centre applied 10mm from the top edge of the KS1000RW sheet.
-
Personnel
- Installer
- A2O
-
40no. Poppy red stainless steel self-drilling self-tapping primary fixings with minimum 16mm diameter non-ferrous EPDM backed washer, complete with 35 x 23 storm washers
-
Personnel
- Installer
- A2O
-
Factory applied stiching plate
-
Personnel
- Installer
- A2O
-
6no. KR-VRT-SS-30 poppy red 6.3mm diameter x 30mm long stainless steel stitching screw with 19mm diameter washer. 2 per valley
-
Personnel
- Installer
- A2O
-
All fixings to be in line 30mm up from the edge of the rooflight cutback
-
Personnel
- Installer
- A2O
Panel over rooflight end lap detail
-
50mm x 8mm butyl tape with PE foam co laminate centre applied 10mm from the top edge of the KS1000RW sheet.
-
Personnel
- Installer
- A2O
-
4no. Poppy red stainless steel self-drilling self-tapping primary fixings with minimum 16mm diameter non-ferrous EPDm backed washer, complete with 35 x 23 storm washers.
-
Personnel
- Installer
- A2O
-
Factory applied stitching plate
-
Personnel
- Installer
- A2O
-
6 no. KR-VRT-SS-30 poppy red 6.3mm diameter x 30mm long stainless steel stitching screw with 19mm diameter washer. 2 per valley.
-
Personnel
-
All fixings to be in line 30mm up from the edge of the rooflight cutback
-
Intermediate rooflight fixing detail
-
Rooflights to be fixed at every purlin location with 4no. Poppy red stainless steel self-drilling self-tapping primary fixings with minimum 16mm diameter non-ferrous EPDM backed washer, complete with 35 x 23mm storm washers at crown locations to intermediate rails
-
Side lap details
-
Kingspan FAWS side lap sealant or site applied butyl
-
-
6 x 5mm butyl rubber sealant applied in continuous unbroken length at sidelap to weather side of stitching screws
-
-
50mm polyband applied in continuous unbroken length to seal existing stitcher fixing holes
-
-
Install side lap cover cap to side lap of KS1000RW
-
-
Side laps to be stitched at maximum 300mm centres with poppy red stainless steel stitcher screws 6.3mm diameter x 30mm long with 19mm washer
-
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature:
-