Annual Inspection Sheet for YYYY
DAMPER TEST
-
- Inform Engineers of damper test
-
- Visual inspection of unit
-
- Close the damper and assess how seized it is
-
- Cycle the damper between open and closed a few times, lubricate with T9 if necessary
-
- Reset the damper by holding open the flap with the handle, engaging the pull chord action lever and slowly releasing the handle so the spring load of the flap rests on the action
Manual Fire Dampers
JANUARY
-
Use Plan to locate dampers if needed
-
Bridge Deck Forward Port Locker - Foreship Accommodation Extraction E2 (Pull Ring)
-
Bridge Deck Forward Port Locker - Bow Thruster Extraction E5 (Pull Ring)
FEBRUARY
-
Use Plan to locate dampers if needed
-
Bridge Deck Forward Starboard Locker - Battery Locker (Pull Ring)
-
Bridge Deck Forward Starboard Locker - Foreship FA-2 Supply (Pull Ring)
-
Bridge Deck Forward Starboard Locker - Bow Thruster Supply E5 (Pull Ring)
-
Bridge Deck Forward Starboard Bridge Wing - Laundry Extraction (Manual Flap)
MARCH
-
Use Plan to locate dampers if needed
-
Bridge Deck Forward Port Side Deckhead - Offices/Sanitary Spaces E7B (Pull Ring)
-
Bridge Deck Forward Port Side Deckhead - Main Pantry (Pull Ring)
-
Bridge Deck Forward Port Side Deckhead - Bridge Deck Supply (Pull Ring)
-
Bridge Deck Forward Port Side Deckhead - Bridge Deck Extraction (Pull Ring)
APRIL
-
Use Plan to locate dampers if needed
-
Main Deck Port Side Deckhead - Aft Ship Accommodation Extraction E1 (Pull Ring)
-
Main Deck Aft Port Side Deckhead - Technical Space Supply S6 (Pull Ring)
-
Main Deck Aft Port Side Deckhead - Beach Club Extraction E4 (Pull Ring)
-
Reset handle for Beach Club Extraction E4 is in MD wash locker near immersion suits (spring and hinge reset handle)
MAY
-
Use Plan to locate dampers if needed
-
Main Deck Aft Starboard Side Deckhead - Emergency G/E Supply S4 (Pull Ring)
-
Main Deck Aft Starboard Side Deckhead - Beach Club Supply E4 (Pull Ring)
JUNE
-
Use Plan to locate dampers if needed
-
Main Deck Starboard Deckhead - Aft Ship FA-1 Supply E4 (Pull Ring)
-
Main Deck Starboard Deckhead - Emergency G/E Extraction S4 (Pull Ring)
-
Main Deck Starboard Deckhead - Laundry Supply (Pull Ring)
JULY
-
Use Plan to locate dampers if needed
-
Main Deck Aft Port Side Bulwark - Technical Space Extraction S6 (Manual Screw Down)
AUGUST
-
Use Plan to locate dampers if needed
-
Main Deck Aft Starboard Bulwark - Petrol Store Extraction E9 (Manual Screw Down)
-
Main Deck Aft Starboard Bulwark - Water Mist Extraction (Manual Screw Down)
-
Main Deck Aft Starboard Bulwark - Water Mist Supply (Manual Screw Down)
SEPTEMBER
-
Use Plan to locate dampers if needed
-
Main Deck Aft Port Bulwark - Steam Room Overpressure One (Manual Screw Down)
-
Main Deck Aft Port Bulwark - Steam Room Overpressure Two (Manual Screw Down)
-
Main Deck Aft Port Bulwark - Steam Room Overpressure Three (Manual Screw Down)
OCTOBER
-
Use Plan to locate dampers if needed
-
Beach Club Dive Store Forward Cabinet - Steam Room Extraction (Pull Ring)
NOVEMBER
-
Use Plan to locate dampers if needed
-
Bosun's Locker Aft - Petrol Store Overpressure One (Pull Ring)
-
Bosun's Locker Aft - Petrol Store Overpressure Two (Pull Ring)
DECEMBER
-
Use Plan to locate dampers if needed
-
Forepeak Starboard Extraction (Manual Screw Down)
-
Forepeak Port Supply (Manual Screw Down)