Title Page
-
Conducted on
-
Williamstown Sewer Lining Project
DETAILS
-
Client / Site:
- Manhole 1
- Manhole 2
- Manhole 3
- Manhole 4
-
Works Description:
- Flow Isolation
- Flow Restriction
INSPECTION CRITERIA
-
Type of plug that is being installed / fitted
- Pig Type lnflatable Plug
-
Photo evidence of the pressure gauge:
-
Is the plug & pipe connection maintaining the required pressures when tested<br>
-
Is the pressure controlling device in current calibration
-
Does the plug & connection show signs of any structural damages, breakages or loose fittings
-
Does the plug & pipe connection show signs of stress or distortion to integrity
-
If the plug is anchored or housed to another support connection point, are there any signs this connection is loose or poorly secured
APPROVALS
-
Other Comments
-
Person Completing the Checklist
- Adrian Kohlman
- Htcyytfyjfyjf
- Gvjghvkhgvhkv
- Vghvkjyvuykv
- Jhvghkvkhgvk
- Gvjhvhtvhk
-
Signature: