Information

  • Complete this document ONLY when extra work is performed. A daily ticket should still be completed for any contract work performed. It is acceptable to omit the specifics of extra work from you daily ticket, as long as you reference this document and state on your daily report that extra work was performed.

  • Job ID:

  • Brief description of the Extra Work activity:

  • Jobsite Location:
  • Name of Client/Contractor:

  • Extra Work Performance Date:

  • Extra Work activity complete?

  • Percent of Extra Work complete for this activity:

  • Report Prepared By:

Daily Report

Site Conditions

  • Today's Weather and Job Site Conditions:

  • Today's High Temperature:

  • Today's Low Temperature:


  • https://www.wunderground.com/history/

Labor

  • Was any contract work performed while onsite today?

  • What time did you arrive on site?

  • What time did you leave the site?

  • Travel time to jobsite (ONE WAY ONLY):


  • https://www.google.com/maps/dir/3708+Conquest+Drive,+Garner,+NC//@35.7297731,-78.6102056,13z/data=!3m1!4b1!4m8!4m7!1m5!1m1!1s0x89ac5e0f9a068737:0x323c2789565d8572!2m2!1d-78.5751862!2d35.7297782!1m0

  • What time did you begin EXTRA WORK?

  • What time did finish EXTRA WORK?

  • List ONLY the employees who were performing EXTRA WORK today, along with their time spent on EXTRA WORK (do NOT include travel time). Place an "(S)" before the Superintendents name(s):

Equipment

  • How many Crew Trucks were onsite today?

  • Do we have any equipment onsite?

  • List ALL equipment onsite that is owned by Advance Concrete. Also, if the equipment was used for EXTRA WORK, then list what it was used for and the number of hours it was used on this day:

  • List ALL equipment that you currently have on rent at the jobsite, including vendor names and PO numbers. Also, if the equipment was used for EXTRA WORK, then list what it was used for and the number of hours it was used for on this day:

  • Include a picture(s) of the rental agreement ticket(s) from today

Materials

  • Were any Advance Concrete stock OR purchased materials used for the EXTRA WORK today?

  • List all permanent materials used for EXTRA WORK on this job today and what the material was used for. Include PO numbers and vendor names of materials purchased:

  • Include pick ticket picture(s) of any materials purchased today (if applicable):

Production

  • Give a full and detailed description of today's EXTRA WORK, including a detailed description of where the extra work took place:

  • Take pictures of the EXTRA WORK performed and take pictures of your highlighted drawings showing where the EXTRA WORK was performed:

Signatures

  • Advance Concrete Superintendent name & signature:

  • Customer/Client name & signature, verifying that the work described above AND that the number of crew members and their hours spent on the work listed above is accurate:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.