Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

LABOURER

  • Walls

  • PLEASE ADD SQM

  • PLEASE ADD SQM

  • Floor

  • PLEASE ADD SQM

  • PLEASE ADD SQM

  • PLEASE ADD SQM

  • Ceiling

  • PLEASE ADD SQM

  • IT NEEDS TO BE SCRAPED?

  • PLEASE ADD SQM

  • PLEASE ADD SQM

GAS

  • Is it necessary to relocate the gas point more than 3 meters away from its existing position?

  • Please add the length of the renewed pipe.

  • CP1

  • CP12

ELECTRIC

  • New metal ccu to 18th Edition 11 way with RCBO / RCD protection<br>

  • CARBON MONOXIDE DETECTOR:INSTALL BATTERY TYPE<br>

  • POWER:NEW SPUR OUTLET GROUND FLOOR NE 10M<br>

  • Hard wired heat or smoke alarm<br>

  • Please select location

  • Core hole in external wall for new kitchen fan <br>

  • Fit fan in the window

PLUMBER

  • Does the Sure Stop need to be fixed?

  • Please add length of 15mm copper pipe is needed for 1st fix kitchen.

  • Please list the appliances that need to be connected to the water supply.

  • Does the boiler overflow need to be relocated?

  • Please add the length of the renewed overflow pipe.

  • Please add details about the drainage.

  • Does the exterior wall need to be drilled for this work?

  • Are any modifications needed for the heating system?

  • The radiator needs to be disconnected/reconected.

  • Is a new radiator required to be installed?

  • Are the valves being replaced as well?

  • Does it need to be relocated as well?

  • Please add the distance to which it needs to be relocated.

  • Does the radiator need to be canceled?

  • We need to relocate the position of the radiator.

  • Please add the distance to which it needs to be moved.

PLASTER

  • Walls

  • Skim

  • Please add the required square meters.

  • Please add the required square meters of bonding agent.

  • Bond/Set

  • Please add the required square meters.

  • Plasterboard

  • What type of plasterboard should we use?

  • Make good

  • Ceiling

  • Skim

  • Please add the required square meters.

  • Please add the required square meters of bonding agent.

  • Bond/set

  • Please add the required square meters.

  • Plasterboard

  • Please add the required square meters.

  • Make good

  • Latex

  • Please add the square meters required.

  • Do we have a hatch to block in the kitchen?

CARPENTER

  • Base Units

  • How many BU 1000/600 do we have?

  • How many BU smaller than 1000/600 do we have?

  • How many draw pack BU do we have?

  • How many corner base units do we have? Please add if any modifications are necessary for these units.

  • How many baseend panels do we have?

  • How many joint strip do we have?

  • How many end cap strip do we have?

  • What is the length of the worktop?

  • What is the length of the plinth?

  • Does a box need to be made for the pipes under the boiler?

  • Is it necessary to make boxes for the pipes?

  • Please add the length of these boxes

  • Does new skirting need to be installed?

  • Please add the lenght of skirting

  • Wall Units

  • How many wall units do we have?

  • How many wall end panel do we have?

  • Is it necessary to make boxes for the pipes?

  • Please add the lenght for boxes

  • Door

  • Ease&adjust

TILING

  • Wall tiles

  • Wall tiles size 200 by 100 / SQM.

  • Wall tiles size 150 by 150 / SQM.

PAINTING

  • The size of the kitchen.

  • Do the doors in the kitchen need to be painted? Please add the number of doors.

  • Do the windows in the kitchen need to be painted? Please add the number of windows.

  • Does the radiator in the kitchen need to be painted?

  • Are there any issues with the walls or ceilings?

  • Please add the square meters of the affected area.

  • Please add the square meters of the affected area.

  • Please add the square meters of the affected area.

FLOORING

  • Please add the size of the floor.

  • Are there any cupboards or extra spaces where we need to install flooring?

  • Please add the size of the floor.

FINALS

  • Renew Aluminium twice splayed door threshold ne 1.00m long.

  • Clean all PVC doors and frames to include glass pains.<br>

  • Seal junction with mastic sealant(floor, worktop)

  • Renew window cill to PVCU

  • Renew window trims to PVCU

  • Remove and redo the silicone at the joint between the window and trims.

  • Fix new access panel PVCU

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.