LABOURER
-
Walls
-
PLEASE ADD SQM
-
PLEASE ADD SQM
-
Floor
-
PLEASE ADD SQM
-
PLEASE ADD SQM
-
PLEASE ADD SQM
-
Ceiling
-
PLEASE ADD SQM
-
IT NEEDS TO BE SCRAPED?
-
PLEASE ADD SQM
-
PLEASE ADD SQM
GAS
-
Is it necessary to relocate the gas point more than 3 meters away from its existing position?
-
Please add the length of the renewed pipe.
-
CP1
-
CP12
PLUMBER
-
Does the Sure Stop need to be fixed?
-
Please add length of 15mm copper pipe is needed for 1st fix kitchen.
-
Please list the appliances that need to be connected to the water supply.
- WM
- DW
- F/F
- Water Dispenser
-
Does the boiler overflow need to be relocated?
-
Please add the length of the renewed overflow pipe.
-
Please add details about the drainage.
- Renew only inside kitchen
- We need to connect it outside the kitchen
- Works on the main stack pipe are necessary
-
Does the exterior wall need to be drilled for this work?
-
Are any modifications needed for the heating system?
-
The radiator needs to be disconnected/reconected.
-
Is a new radiator required to be installed?
-
Are the valves being replaced as well?
-
Does it need to be relocated as well?
-
Please add the distance to which it needs to be relocated.
-
Does the radiator need to be canceled?
PLASTER
-
Walls
-
Please add the square meters of skim required.
-
Please add the square meters required.
-
Please add the square meters required.
-
Ceiling
-
Please add the square meters required.
-
Please add the square meters required.
-
Please add the square meters required.
-
Latex
-
Please add the square meters required.
-
Do we have a hatch to block in the kitchen?
CARPENTER
-
Kitchen installation
- Walls
- Floor
- Door
-
Renew any type of pre-finished 1000x600mm base unit
-
Renew any type of pre-finished under 1000x600mm base unit
-
Renew any type of pre-finished single 600x600mm Draw pack base unit
-
Renew plinth to any base unit
-
Renew with high density waterproof MR chipboard worktop, 40mm thick
-
Fix new aluminium end strip to worktop.
-
Fix new aluminium joint strip to worktop.
-
Larder unit NE 600 wide x 2100 high
-
Larder unit end panel
-
Fit base end panel and scribed to the wall.
-
Supply and fit Hafele cabinet lock to sink base unit.
-
Sink Top:Renew with any size/type stainless steel single drainer sink top, waste, plug, chain, trap, service valves, make all connections, splashback, sealant, crossbond, test.
-
Box in pipework below boiler using kitchen end panel to size and lip edges
-
Plywood 6mm to floor / sqm
-
Box-in pipes / lm
-
Renew any type of pre-finished single wall unit
-
Supply and fit wall end panel and scribed to the wall.
-
Box-in pipes / lm
-
Fix new Skirting
-
E&A door
TILING
-
Fix new tiles 200/100 to walls / sqm
PAINTING
-
The size of the kitchen.
-
Do the doors in the kitchen need to be painted? Please add the number of doors.
-
Do the windows in the kitchen need to be painted? Please add the number of windows.
-
Does the radiator in the kitchen need to be painted?
-
Are there any issues with the walls or ceilings?
-
Please add the square meters of the affected area.
-
Please add the square meters of the affected area.
-
Please add the square meters of the affected area.
FLOORING
-
Please add the size of the floor.
-
Are there any cupboards or extra spaces where we need to install flooring?
-
Please add the size of the floor.
FINALS
-
Renew Aluminium twice splayed door threshold ne 1.00m long.
-
Clean all PVC doors and frames to include glass pains.<br>
-
Seal junction with mastic sealant(floor, worktop)
-
Renew window cill to PVCU
-
Renew window trims to PVCU
-
Remove and redo the silicone at the joint between the window and trims.
-
Fix new access panel PVCU