Title Page
-
Airport
-
Handling company
-
Conducted on
-
Prepared by
-
Please provide photographic evidence of all items inspected.
-
1. How often are scheduled maintenance checks carried out (ask station management)?
-
2. Vehicles fitted with hydraulics (High Loaders etc) - Are hydraulic hoses replaced as a minimum every 10 years and subject to inspection on every maintenance check?
-
3. Do the vehicles have equipment pre-use checklist?
-
4. Are all the lights and indicators working correctly? (check 5 random pieces of GSE)
-
5. Are tyres in good condition with acceptable tread depth and no other visible defects? (check 5 random pieces of GSE)
-
6. Are dolly / cart brakes functioning correctly? (check 5 random dollies / carts)
-
7. If fitted, are windscreen wipers and blower working correctly?
-
8. Are vehicles fitted with fire extinguishers and are the extinguishers serviceable (needle in a green zone and within required service intervall)?
-
<br>9. Operators Area - Is operators seat in good condition, the area free from FOD, and seatbelts operational (if fitted)?
-
10. Is GSE fitted with orange beacon (rotating or flashing) and is the beacon functioning?
-
11. Are all GSE parts interfacing the aircraft protected with good quality buffer and are all buffers in good condition (no cracks or protruding elements)?
-
12. Are tow hitches in good working conditions (check 5 pieces of GSE)?
-
13. Are GSE fitted with emergency stop buttons and are those working correctly (test on 3 pieces of GSE)?
-
14. Are vehicle windows free from cracks or chips?
-
15. Are all wheel studs in place on GSE wheels (check 5 pieces of GSE)?
-
16. If fitted, are wing and rear view mirrors in good condition?
-
17. Are vehicles fitted with audible reverse alarm?
-
18. Is GSE less than 10 years old (15 years for hi-loaders) - check manufacturer's data plate?
-
19. Is there a formalised process for GSE acceptance on station (initial GSE check - ask station management)?
-
20. If vehicle is visibly altered from manufacturer's specification, has manufacturer's approval been received (ask station management)?
-
21. Is GSE defect reporting system in place? (ask to see last 5 defect reports)