Title Page
-
Conducted on
DETAILS
-
Client / Site: Barwon Water - Black Rock WRP Inlet Works Upgrade 400 Black Rock Connewarre
-
Inspection Area:
-
Reference: BW Technical Specification Rev 0 Clause:
-
Document No. CA-CS-0????????????? ITP No:
VISUAL CHECKLIST
-
Correct type of Light installed as per design
-
Light fittings comply with specifications
-
Circuits are clearly identified
-
All stopping plugs and bolts are in position
-
The is no damage to the equipment or cabling
-
Location does not impede access to walkways or other items of plant
-
Guards are correctly fitted if required
-
All lights are easily accessible for maintenance
-
Cable glands and shrouds installed correctly and fit for purpose
-
Weather protection if required
-
All seal are satisfactory
-
Electrical connection are tight
-
Visual inspection
-
No corrosion / IP56
-
Swivel poles can rotate freely without impacting adjacent equipment
-
Asset and cable labels installed and correct as per drawing
-
All switches installed and ready for energisation
-
Notes/Comments
APPROVALS
-
General DB Circuit Inspection is
-
Actions to be taken:
-
Entered on Punch List
-
Punch list Reference Number:
-
Item No:
-
Person Completing the Checklist
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature:
-
Agfab Approval By:
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature: