Information
-
Client / Site
-
Project ID:
-
Conducted on
-
Checklist review undertaken by:
- John Frattin
- Alan Nield
- Greg Grima
- Graham Davis
- Ian McCormick
- George Lubczenko
- Peter Cations
- Roland Frost
-
AMS in use - Title and Date:
-
WRA Date:
-
Does the activity contain (HRW) High Risk Work ?
WRA – Workplace Risk Assessment
-
WRA captures all high level risks associated with the project?
-
WRA has appropriate system and training level controls for identified risks?
-
WRA has been authorised by the person in control of site?
-
WRA is current (evidence of review within last 3 months as minimum)?
-
WRA accessible/displayed in a common area?
AMS – Activity Method Statement
-
All AMS’s nominated on the WRA are built into the (WBS) Works Breakdown Structure (and / or Programme) and are developed for current Works?
-
AMS captures all risks associated with the defined activity?
-
AMS includes a detailed description of the works? (Including methodology, sequence, plant and equipment, materials, number of people and competencies required, etc.)
-
AMS includes reference to supporting drawings, permits, approvals, SWMS, ITP’s, SQE Plans, etc associated with the activity?
-
AMS has been authorised by person in control of activity?
-
AMS is current (evidence of review within last 1 month as minimum)?
-
Has the methodology changed? If yes, have all risks been reassessed?
-
AMS risk controls have considered hazard elimination or engineering controls?
-
Evidence that AMS control measures have been actioned (completed and signed off)?
-
AMS is in open display for all to see in site office?
High Risk Activity AMS Review (if applicable)
-
AMS identified the High Risk Activity?
-
AMS captures all the key risks associated with the High Risk Activity?
-
AMS has been authorised by person in control of activity and accepted by BW project management?
-
High Risk Activity AMS risk controls have considered hazard elimination or engineering controls?
Commissioning AMS Review (if applicable)
-
Has the AMS been reviewed by the SQE Manager and signed off by the SPM & Barwon Water Ops?
-
Does the commissioning require connection into a live system or Isolation ? If yes is there valve status checklist !
-
At the time this review was undertaken the WRA/AMS documentation and controls implemented meet the contractual minimum requirements.
-
Persons conduction the review:
-
Workplace Manager: