Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Consent Details

  • DA/CDC/CC No.

Onsite Inspection

  • Are there any outstanding items from previous inspections?

  • Are environmental controls stated in the development consent installed on site?

  • Is the building under construction consistent with the consent/certificate including modification?

Component: Frame

  • Do the following components accord with the BCA or manufacturer's specifications?

  • Subfloors

  • Subfloor braces

  • Timber preservative treatment/s

  • Ant capping

  • Point load/bearing joists

  • Ventilation

  • Mechanical connections

  • Bolted connections

  • Timber sizes/spans

  • Solid blocking

  • Bearers and joists

  • Floors

  • Joists

  • Substrate fixing for membranes

  • Timber preservative treatment

  • Timber sizes/spans

  • Point load/bearing joists

  • Timber beams

  • Steel beams

  • Wall

  • External bottom plate fastening

  • Internal bottom plate fastening

  • Bracing

  • Brace height

  • Brace fixing

  • Crippling of stud

  • Timber sizes/span

  • Framing notches/holes

  • Nail plates

  • Lintel size/ fixing/ support

  • Damp proof course/ flashings

  • Timber preservative treatment

  • Roof

  • Pitch/type

  • Purlin fixing

  • Rafter straps/ concealed purlin cleats

  • Purlin fixings

  • Ceiling batten fixing

  • Truss spacing/tie downs

  • Secondary bracing, ceiling/roof

  • Does the steel frame comply with the acceptable construction manuals of the BCA for design and installation?

  • Do window or door openings accord with the consent/construction?

  • Have relevant conditions of the consent required to be incorporated in the construction of the building, been implemented?

  • Does the demolition accord with the consent/certificate?

  • Have relevant BASIX commitments been implemented?

  • Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part1.2 of the BCA?

Component: Structural Steel

  • Has the structural steelwork been installed as per structural engineer's design?

  • Has the structural steelwork been connected and fastened as per structural engineer's design?

  • Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?

  • Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?

Component: Masonry

  • Do the following components accord with the BCA or manufacturer's specifications?

  • Suitable for location

  • Cavity

  • Perpends

  • Width

  • Cleanliness of cavity

  • Weepholes

  • Articulation joints

  • Fixing straps and tie down systems

  • Lintels

  • Damp proof membrane

  • Wall tiles, size/spacing

  • Mortar mix

  • Isolated piers

  • Flashing correctly installed (windows, doors, roofs, parapets, chimney)

  • Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?

  • Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?

  • Add signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.