Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Region
-
Contractor
-
Job Description
-
Audit Date
-
Time
1. Metering
-
Has the correct meter been installed at the correct address?
-
Has the correct meter been installed for the installation?
-
Has the meter been installed at correct level and height?
-
Has metering equipment been firmly secured to the board and or structure?
-
Have tamper seals been installed on all metering equipment?
-
Have the correct fasteners been used to secure metering equipment?
-
Is the metering equipment in good working order? E.g. links, fuses, panel.
-
Is the condition of the meter board or panel acceptable?
-
Should the board or panel be defected?
-
Is the condition of the customer meter enclosure acceptable?
-
Should the enclosure be defected?
-
Has antenna been installed correctly as per work instruction?
-
Has the IP rating of the meter cabinet been maintained? When antenna installed
-
Have meter commissioning requirements been completed?
-
Have terminal connections been secured firmly?
-
Is external antenna connection under terminal cover secure?
-
Rating plate is clear and well-marked?
-
Serial no and spec no clearly identified?
-
Continuous and rupture current as per approved drawing?
-
CT and VT nameplates as per approved design?
2. Work Practices
-
Has asbestos been identified and appropriate procedures followed.
-
Has all unused metering cable been removed or terminated?
-
Has all unused metering equipment been removed? e.g. time switch, fixing screws
-
Has non compliant meter wiring been identified as a customer defect?
-
Has the work site been left tidy?
3. Communications
-
Was the householder notified by the installer of meter exchange prior meter exchange?
-
Was the customer / occupier notified of meter exchange? By mail
-
Was an information card lift on site for the customer/ occupier?
-
Comments