Information

  • Document No.ELE-BNK

  • Audit title: Stage 1 & Stage 2 Bunker VESDA fortnightly routines

  • Client: Estate Services Yallourn

  • Conducted on

  • Revision: 1.0 Prepared by :

INSPECTION, TESTING AND MAINTENANCE PROCEDURES

  • Work Order Number:

Site details and client

  • Site : Yallourn W Power Station Client : Paul Gridley - Estate Services

Preliminary Checks - Location of VESDA unit : Stage One Coal Bunker South

  • VESDA Type : VESDA Laser Industrial

  • Smart Filter used percentage :

  • Internal filter used percentage :

  • Aspirator used percentage :

  • Chamber used percentage :

Airflows

  • Pipe 1 Airflow:

  • Pipe 2 Airflow:

Power Supply

  • Power supply voltage :

  • Any additional comments :

Maintenance

  • Filter replaced?

  • Backflush of pipe work conducted?

  • Simulated fire alarm test ok?

  • Simulated system fault test ok?

  • Simulated airflow fault test ok?

  • Any additional comments :

Visual Inspection

  • Add media

  • Visual inspection of VESDA head and pipework ok?

  • Please describe fault found and follow up works required

  • Information - This installation does not comply to Australian Standards 1670

Preliminary Checks - Location of VESDA unit : Stage One Coal Bunker North

  • VESDA Type : VESDA Laser Industrial

  • Smart Filter used percentage :

  • Internal filter used percentage :

  • Aspirator used percentage :

  • Chamber used percentage :

Airflows

  • Pipe 1 Airflow:

  • Pipe 2 Airflow:

Power Supply

  • Power supply voltage :

  • Any additional comments :

Maintenance

  • Filter replaced?

  • Backflush of pipe work conducted?

  • Simulated fire alarm test ok?

  • Simulated system fault test ok?

  • Simulated airflow fault test ok?

  • Any additional comments :

Visual Inspection

  • Add media

  • Visual inspection of VESDA head and pipework ok?

  • Please describe fault found and follow up works required

  • Information - This installation does not comply to Australian Standards 1670

Preliminary Checks - Location of VESDA unit : Stage Two Coal Bunker South

  • VESDA Type : VESDA Laser Industrial

  • Smart Filter used percentage :

  • Internal filter used percentage :

  • Aspirator used percentage :

  • Chamber used percentage :

Airflows

  • Pipe 1 Airflow:

  • Pipe 2 Airflow:

  • Pipe 3 Airflow:

  • Pipe 4 Airflow:

Power Supply

  • Power supply voltage :

  • Any additional comments :

Maintenance

  • Filter replaced?

  • Backflush of pipe work conducted?

  • Simulated fire alarm test ok?

  • Simulated system fault test ok?

  • Simulated airflow fault test ok?

  • Any additional comments :

Visual Inspection

  • Add media

  • Visual inspection of VESDA head and pipework ok?

  • Please describe fault found and follow up works required

  • Information - This installation does not comply to Australian Standards 1670

Preliminary Checks - Location of VESDA unit : Stage Two Coal Bunker North

  • VESDA Type : VESDA Laser Industrial

  • Smart Filter used percentage :

  • Internal filter used percentage :

  • Aspirator used percentage :

  • Chamber used percentage :

Airflows

  • Pipe 1 Airflow:

  • Pipe 2 Airflow:

  • Pipe 3 Airflow:

  • Pipe 4 Airflow:

Power Supply

  • Power supply voltage :

  • Any additional comments :

Maintenance

  • Filter replaced?

  • Backflush of pipe work conducted?

  • Simulated fire alarm test ok?

  • Simulated system fault test ok?

  • Simulated airflow fault test ok?

  • Any additional comments :

Visual Inspection

  • Add media

  • Visual inspection of VESDA head and pipework ok?

  • Please describe fault found and follow up works required

  • Information - This installation does not comply to Australian Standards 1670

Preliminary Checks - Location of VESDA unit : Stage Two Coal Bunker North

  • VESDA Type : VESDA Laser Industrial

  • Smart Filter used percentage :

  • Internal filter used percentage :

  • Aspirator used percentage :

  • Chamber used percentage :

Airflows

  • Pipe 1 Airflow:

  • Pipe 2 Airflow:

  • Pipe 3 Airflow:

  • Pipe 4 Airflow:

Power Supply

  • Power supply voltage :

  • Any additional comments :

Maintenance

  • Filter replaced?

  • Backflush of pipe work conducted?

  • Simulated fire alarm test ok?

  • Simulated system fault test ok?

  • Simulated airflow fault test ok?

  • Any additional comments :

Visual Inspection

  • Add media

  • Visual inspection of VESDA head and pipework ok?

  • Please describe fault found and follow up works required

  • Information - This installation does not comply to Australian Standards 1670

Signatures

  • Signature of Technician:

  • If there is a serious system fault or issue, print a copy of this report and request signatures from Estate Services Alliance Manager and the Estate Services Facilities Manager.

  • Signature of Facilities Manager:

  • Signature of Alliance Manager:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.