Title Page
-
Site conducted.
-
Conducted on.
-
Prepared by.
-
GPS Location.
-
Site plan please view.
-
In signing this log book you are acknowledging that you have read and understood the information held within the Asbestos risk register.
Declaration
-
1. Where more than one individual from the same contracting organisation is present on-site to conduct a specific task, only the supervisor or person in charge need sign the log. 2. Where Building Services or other contractors are on-site operating to several different works orders, a separate record is to be made for each Works Order. 3. Where the contractor's work extends over a few days, only one entry (on the first day of work) is required. 4. I will not carry out any work without assessing the asbestos information provided in full. 5. Unless informed otherwise I will assume that the asbestos information provided is based on a management survey and I understand its limitations. If my activities are non-routine and likely to disturb concealed materials I will not proceed until I am satisfied that a refurbishment and demolition survey has been completed and I have assessed its findings. 6. I understand that asbestos may be present, in the locations reported and there is the opportunity for further asbestos to be present in the buildings. 7. I will not proceed with any work if I suspect my activities will cause an uncontrolled disturbance of asbestos. 8. If any known or suspected asbestos containing materials are accidentally disturbed as a result of my activities I will stop work immediately and report this to the building manager. 9. If I encounter any suspected asbestos which have not been reported I will report this to the building manager 10. I will only undertake tasks on asbestos containing materials; * if a suitable and sufficient risk assessment is completed * in accordance with a suitable plan of work and * if I am adequately trained to undertake that plan of work.
Contractor acknowledgment
-
Contractor Name.
-
Company/organisation.
-
Reason for visit/proposed work area.
-
Register & site specific Risk Assessment Inspected.
-
Date/Time.
-
Contractor Signature.
-
Site Staff signature.