Title Page
-
Property Address
undefined
-
-
Conducted on
-
Prepared by
-
Deal ID No:
Property
-
Accurately Locate the Property using Map Location
-
Type of Property
-
No of Bedrooms
-
Approximate age of Property
-
Has the property been extended
-
Approximate age of extension
-
Does the property have a “Live” EPC
-
Record EPC No:
-
Is the property under or about to undergo renovation?
-
Give brief details
-
Are there any restrictions to access the property - Narrow lanes, parking restrictions, steps ect.
-
Give details
-
Can deliveries of material/equipment be off loaded safely from the delivery lorry onto the customers land.
-
Where will the material/equipment dropped off and what provision will have to be made.
Heating/Hot Water System:
-
At the end of the survey, you will be asked the following questions about the system. Please bear these questions in mind whilst carrying out the survey. 1. Location of the existing boiler? 2. Location of existing Hot Water Cylinder if applicable? 3. Is there evidence the existing system is a 1 pipe or 2 pipe system? 4. Are the hot water primaries pumped or gravity? 5. What type of controls system? a. Y Plan – Boiler flow is diverted through 3 port valve to heating, hot water or both. b. S Plan. - 2 separate 2 port valves control water to heating or hot water c. W Plan. - Pumped heating circuit and gravity fed hot water. d. C Plan. - Boiler flow is diverted through 3 port valve to heating or hot water 6. Location of any existing room thermostats 7. Is there evidence of the use of Low Carbon Steel/BS1387 pipework in the existing system? 8. Is there evidence of micro bore pipework being used in the heating system? 9. What is the the size of the incoming cold water main size? 10. Is there sufficient cold water flow to the unvented cylinder?
Untitled Page
- Room
-
Room Name
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
No of radiators in room
-
Radiator 1
- Single Panel Radiator
- Double Panel Radiator
- K1 Radiator
- K2 Radiator
- K3 Radiator
- Designer Radiator
- Fan Convector
- Underfloor Heating
-
Height of radiator (mm)
-
Width of radiator (mm)
-
Maximum height available for possible replacement radiator (ie floor to window sill)
-
Is a Thermostatic Radiator Valve fiited
-
Pipe connection size to radiator (mm)
- 8mm
- 10mm
- 12mm
- 15mm
- 22mm
- Low Carbon Steel/BS1387
-
Radiator 2
- Single Panel Radiator
- Double Panel Radiator
- K1 Radiator
- K2 Radiator
- K3 Radiator
- Designer Radiator
- Fan Convector
- Underfloor Heating
-
Height of Radiator (mm)
-
Width of Radiator (mm)
-
Maximum height available for possible replacement radiator (ie floor to window sill)
-
Is a Thermostatic Radiator Valve fitted?
-
Pipe connection size to radiator (mm)
- 8mm
- 10mm
- 12mm
- 15mm
- 22mm
- Low Carbon Steel/BS1387
-
Radiator 3
- Single Panel Radiator
- Double Panel Radiator
- K1 Radiator
- K2 Radiator
- K3 Radiator
- Designer Radiator
- Fan Convector
- Underfloor Heating
-
Height of Radiator (mm)
-
Width of Radiator (mm)
-
Maximum height available for possible replacement radiator (ie floor to window sill)
-
Is a Thermostatic Radiator Valve fitted?
-
Pipe connection size to radiator (mm)
- 8mm
- 10mm
- 12mm
- 15mm
- 22mm
- Low Carbon Steel/BS1387
Boiler
-
Water Out Temp WL1 Heating (WL1) Point 1 - 2021
-
Water Out Temp WL1 Heating (WL1) Point 2 - 2022
-
Boiler Make and Model
-
GC Number
-
Type of Boiler
-
Location of Boiler
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
Is the S/Y plan 3 port valve located adjacent to the existing boiler.
Hot Water System
-
Location of existing Hot Water System
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
What is the current Hot Water Solution
- Vented Cylinder
- Unvented Cylinder
- Combi Boiler
- Sunamp/Heat Battery
- Instantaneous Gas/Electric Water Heater
-
Is the new unvented cylinder to be located in the same location as the existing?
-
A new unvented cylinder will need a clear space of 650mm wide x 700mm deep x 2200mm high. Is this available
-
Does this location have an exisiting or suitable route for the D2 PRV pipework drain to outside with suitable pipe.
-
Do the floor joists run parallel to the proposed route for the D2 PRV pipework.
-
Where is the new proposed location
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
ConsIderation for the man handling and positioning of the cylinder, particularly in the loft. A clear loft hatch opening of 575mm x 575mm is required. In addition, a clear height above the hatch of 1800mm is needed. Confirm
-
-
Does this location have an exisiting or suitable route for the D2 PRV pipework drain to outside or soil stack with suitable pipe.
-
Do the floor joists run parallel to the proposed route for the D2 PRV pipework.
-
The new Unvented Cylinder will require a clear footprint of 650mm x 650mm plus pipe connections and a headroom of 2200mm
-
Confirm space available width x depth x height (mm)
-
Re select location
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
If it is proposed to re-use the existing Unvented Cylinder confirm make and model and photograph data plate.
-
Is the S/Y plan 2 or 3 port valve located adjacent to the existing cylinder.
-
Where is the Cold Water Main to the house located.
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
What is the size of the cold water main to the property
-
Is there sufficient flow and pressure for an Unvented cylinder to perform satisfactorily
-
Are the Hot Water Primaries pumped or gravity
Heating
-
Is there evidence that the heating system is a 1 pipe heating system
-
Is there evidence that Low Carbon Steel/BS1387 pipework still in use in the system.
-
Is there evidence of micro bore pipework being used in the system
-
Are there any room thermostats in use
-
Type of thermostat
-
What room is the thermostat located
- Airing Cupboard
- Bathroom 1
- Bathroom 2
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bedroom 7
- Cloakroom
- Corridor 1
- Corridor 2
- Corridor 3
- EnSuite1
- Ensuite2
- EnSuite3
- EnSuite4
- Entrance Hall
- Family Room
- Games Room
- Garden/Sun Room
- Kitchen
- Landing 1
- Landing 2
- Landing 3
- Library/Reading Room
- Living Room
- Loft
- Lounge
- Rear Lobby
- Shower Room 1
- Shower Room 2
- Snug
- Utility Room
-
Is it time programmable
Proposed ASHP Location
-
Describe proposed location of ASHP. Please annotate the pictures to provide additional information.
-
What is the appropriate distance between the hot water cylinder and the ASHP?
-
Will the ASHP be floor or wall mounted?
-
Will the ASHP need to to lifted into position using lifting equipment?
-
Is there a solid base suitable for ASHP
-
Does the proposed location of the ASHP meet the clearance criteria for the ASHP?