ADMINISTRATIVE
-
How many co-workers on site?
-
Have this project reported any incident this Week?
-
Have the First Aid Logs / First Report of Injury been sent to Safety department?
-
Date and time the First Aid Log / First Report of Injury will be send to Safety Department
-
Have been Occucare contacted?
-
Name the Dr. you talked to.
SUPERVISION INVOLVEMENT
-
Conduct a Job site safety survey?
-
Attend or conduct a tool box talk safety meeting?
MTA's
-
Are MTA's conducted and documented for each crew?
-
Does it contain an adequate description of the work being performed?
-
Is there a history of completed MTA's for each crew? (check last 7 days)
-
Does the project team properly store & track MTA documents?
-
Are Safety hazards thoroughly addressed along with controls the hazards on the form?
TOOLBOX TALKS
-
Are toolbox meetings being conducted and documented?
-
Is a toolbox talk completed every week?
-
Is the topic applicable to our work?
FIRST AID / INJURY CARE / HEALTH
-
Are CPR & First Aid certified coworkers on the project?
-
Is a well stocked First Aid kit available?
-
Is there adequate eye wash immediately available at working areas
-
Is drinking water readily available?
-
Are water kegs cleaned regularly and labeled?
-
Are drinking cups provided and properly disposed of?
-
Are toilets clean & properly stocked with paper?
PERSONAL PROTECTIVE EQUIPMENT (PPE) & WORK WEAR
-
Are all coworkers wearing hardhats, and eye protection?
-
Are co-workers wearing face-shield or special eye protection (burning goggles) where required?
-
Are co-workers wearing high visibility work wear and / or vest where they are required?
-
Are coworkers wearing proper work clothing and work boots?
-
Are coworkers wearing hearing protection where they are required?
-
Are co-workers wearing appropriate gloves for the task?
-
Did coworkers inspect their PPE prior to the start of their shift?
PERSONAL FALL ARREST SYSTEM (FALL PROTECTION)
-
Have the coworkers exposed to an immediate fall hazard?
-
Date and Time of Abatement
-
Picture of Abatement
-
Are there any open edge left unprotected?
-
Date and Time of Abatement
-
Picture of Abatement
-
Are all holes (2" & larger) securely covered & marked?
-
Date and Time of Abatement
-
Picture of Abatement
-
Are warning signs posted at leading edge barriers? (Available from Safety)
-
Date and Time of Abatement
-
Picture of Abatement
-
Are proper tie-off points used?
-
How you corrected?
-
Correction Pictures
-
Are coworkers exposed to swing fall hazard?
-
How you corrected?
-
Correction Pictures
-
Are all components of Personal Fall Arrest System (harness, SRLs, anchorage) in good condition?
-
Do you replaced the damaged equipment?
-
When it will be replaced?
-
Picture of replaced equipment
-
Are dual SRL (twin turbo, Diablo) properly connected to harnesses (if used)?
-
Picture of Corrected issue
-
Are coworkers trained for the fall protection system in use?
-
STOP!! CALL JOSE AND SET UP A TRAINING DATE
-
Date of training
-
Are damage / defective fall protection components tagged and removed from service?
-
TAG AND REMOVE IT FROM SERVICE INMEDIATELY
-
Picture of the damage equipment tagged
RIGGING & SIGNALING - Supplement C
-
Are only Atlantic coworkers or NCCO Trained coworker allowed to rig loads & signal cranes?
-
Are riggers / Signal persons properly identified (hard hat stripes and / or vest?
-
Are whistles used to alert others when hoisting / landing loads ?
-
Are tag lines properly attached & used to control loads?
-
Are coworkers keeping their hands free of rigging & loads while hoisting?
-
Is rigging inspected before use?
-
Is there a current documented annual inspection for each chain sling on site?
-
Are chain slings tagged & in proper condition?
-
Are nylon slings tagged & in proper condition?
-
Are wire rope slings tagged & in proper condition?
-
Are damaged / defective rigging components removed from service?
-
Are proper rigging procedures in use for all observed lifts?
-
Does each crane have a dedicated radio channel?
-
Are cranes located a safe distance from power lines?
-
Are weather conditions adequate for hoisting?
-
Is safe access provided for the tower crane operator?
HOUSEKEEPING (PREVENTING SLIP, TRIP & FALLS)
-
Is there adequate lightning in all walkways & work areas?
-
Is task lighting adequate?
-
Are all aisle -ways and emergency routes clear of materials and debris?
-
Are material storage areas orderly & navigable?
-
Are there receptacles for lunch trash?
-
Is all exposed rebar caped to protected coworkers from injury?
-
Are all littler pieces of rebar picked up after cut it?
-
SCORING
A = Compliant or 95 - -100%
B = Positive effort or 85 - 94 %
C = Average effort or 75 - 84%
D = Serious or 0 - 74% -
This audit reflects the condition of the job-site at the time of inspection and limited by the portion of the site that was inspected.
-
Superintendent's Name
-
Personnel Present
-
Safety Officer
-
"COMMITTED TO CREATING A HEALTHY LIFE, FREE OF INJURY, FOR ALL CO- WORKERS"
-
"TOMORROW IS YOUR REWARD FOR WORKING SAFELY TODAY"