Title Page
-
Client
-
Conducted on
-
Prepared by
-
Location
Kitchen 17a
-
Is kitchen display area, clear and unobstructed for customer use
-
Is kitchen fully fitted with no missing componements, as per PDL
-
Are all appliances fiited in securuly
-
Are all cabinets securley fixed
-
Has the worktop been fitted to standard requirement
-
Is the floor safe for trade
-
Have all hinges been fitted to PDL
-
Have all carcass holes been plugged
Kitchen 2B
-
Is kitchen display area clear and unobstructed for customer use
-
Is kitchen fully fitted with no missing components, as per PDL
-
Are all appliances fitted in securuly
-
Are all cabinets securluly fitted
-
Has the tiling been completed to standard
-
Check under cabinet lighting sensor is
Cabinet display area
-
-
Check all perspex doors are present and aligned
-
Are cabinets fully fitted as per PDL
Desk
-
Is desk operational and ready for trade
Door stand
-
Has the stand been fitted safely, are all doors secure
-
Are all door displays in place
Worktop stand
-
Are all display samples in place
-
Are all POS in place and damage free
S& D wall
-
Is POS block in place
-
Are all samples in place
Splashback and handle display wall
-
Is POS in place
Cubes
-
Are cubes placed
Lighting
-
Have all spotlights been fitted as per plan
-
Have all power drops been implemented correctly
-
Has the display lighting been installed
Site clearance
-
Are all site items safely stored (in preperation of) or been collected from site
-
Has goods in and yard been left in a clear position
Contractor performance
-
Has Contractor completed all works to standard
Handover Photos
-
1
-
2
-
2
-
3
-
4
-
5
Sign off
-
All snags to be completed within 1 week of the handover date
-
Site management:
-
Health & safety
-
Project management:
-
Project Summary:
-
For & On Behalf Of Resolution Interiors Ltd
-
For & On Behalf Of B&Q