Information

  • Client

  • Audit Title

  • Site Name

  • Conducted on

  • Prepared by

  • Location
  • Site manager

  • Project manager Responsible.

Site office

  • Has the Site Manager been fully briefed on the project by the Project Manager?

  • Has the Site Manager received the Site Manager pack from the PM or PC and had it explained?

  • Is the site file complete and all documentation in date?<br>

  • Is the project notifiable and, if so, the F10 displayed (answer n/a if the project is not notifiable)?

  • Is the programme displayed in the folder?<br>

  • Is there a suitably developed fire plan in place?

  • Is the Health & Safety Law poster displayed?

  • Have all contractors on site been BPSS checked? (Baseline Personnel Security Standard)

  • Is there a HSE Health and Safety leaflet in the site file?

  • Is there an accident book on site?

  • Is there a fully stocked first aid kit?

Wlefare

  • Are the welfare facilities compliant with CDM 2015?

  • Is there a kettle & microwave?

  • Does the site office/canteen have hot and cold running water?<br>

  • Have paper towels & soap been supplied?

  • Is the site office/canteen clean and tidy?

  • Has drinking water been supplied in the event that mains water is not connected?

  • Do the toilets have hot & cold running water?

  • Are the toilets clean & tidy?

Health & Safety files & site paperwork

  • If pre-2000 build is there an R&D Asbestos report on site? If applicable, have the contractors been instructed where the asbestos is located and has it been clearly identified?<br>

  • Are all contractors & visitors to site signing in and out?

  • Has everyone been inducted (including the site manager)?

  • Are the induction sheets completed correctly?<br>

  • Are all contractor insurance certificates in date?<br>

  • Are the RAMS and where applicable COSHH material safety data sheets and COSHH assessments in the site file for the contractors who are currently working on site and have they been signed by all operatives?<br>

  • Have all hazardous substances and materials eg solvents/paints etc been identified and stored correctly by the contractor with safety data sheets supplied?

  • Is site paperwork (eg means of escape/fire extinguisher/site safety inspection forms) up-to-date?

  • Are permits to work being issued where needed?

Site-specific hazards

  • Are there any planned lifting works and, if so, is there a lifting plan in place (answer n/a if there are no lifting works)?<br>

  • Are there any roof/high level works which require site specific working at height risk assessments?<br>

Working site area

  • Are pedestrians & site traffic segregated?

  • Is there suitable and sufficient access/egress to the site? <br>

  • Is smoking banned on site except in a designated smoking area?<br>

  • Is the correct signage in place? eg muster point, no entry, client specific signage & RI Site Entrance sign

Working at height

  • Has the scaffold / tower scaffold been erected by a PASMA trained operative?<br>

  • Is there valid inspection documentation available for the scaffold?<br>

  • Is the access equipment/MEWP/cherry picker suitable for the task?<br>

  • If harnesses are being used are they the correct type and being used correctly?<br>

  • Do the operators have the correct ticket for the equipment they are using?

  • Are the MEWPs/Cherrypickers in serviceable condition?

  • Are all stepladders Class 1 and issued with permit & tag?

Unit

  • Are there a suitable number of fire points located within the the work area and are they compliant?

  • Are all emergency routes clear & free of obstructions?

  • Is there sufficient fire exit signage in place?

  • Is the site clean and tidy and clear of rubbish?<br>

  • Slips, trips & falls - any concerns?

  • Are all contractors wearing required PPE?<br>

Noise, vibration & hot works

  • Is exposure to noise and vibration being kept to minimum?<br>

  • Is suitable PPE being worn? eg ear defenders, eye protection, gloves

  • Hot works - is the area segregated and fire extinguisher in place?

  • Are pressurised gases being used correctly within the premises?

Miscellaneous items

  • Was the site induction suitable and sufficient to identify all hazards and level of risk?

  • Are excavations being carried out under Permit to Work system, barriered off and covered?<br>

  • Are good manual handling practices being used?

  • Is appropriate lifting equipment provided where necessary?

  • Are all portable appliances fit for purpose and PAT tested?

  • Any additional comments on the build/site?

  • Recommendations/action points for the Site Manager

  • Has your audit identified any additional safety issues which should be added to future audits?

  • Additional photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.