Title Page
-
Site conducted
-
Conducted on
-
D TUCKER
-
CORE A ELEVATIONS
-
MAIN CONTRACTOR:
-
PROJECT NUMBER:
-
QA SHEET NO:
-
ELEVATION/LOCATION:
-
COMMENTS:
-
FIRE BARRIER LAYOUT SCHEDULE/ DRAWING IS AVAILABLE WITHIN THE SITE DOCUMENTATION
-
FIRE BARRIER MATERILAS HAVE BEEN CHECKED AND ARE CORRECT SPECIFICATION AND DIMENSION
-
FIRE BARRIERS HAVE BEEN STORED ON SITE AS PER MANUFACTURERS RECOMENDATIONS
-
INSTALLERS HAVE RECEIVED ON SITE OR REMOTE TRAINING FROM SIDERISE
-
CHECK FIRE BARRIERS ARE INSTALLED AS PER CONSTRUCTION DRAWINGS
-
FIXINGS STRAPS TO HORIZONTAL FIREBREAKS ARE INSTALLED CORRECTLY
-
ARE HORIZONTAL AND VERTiCAL FIREBREAKS INSTALLED TO CORRECT LOCATIONS AS PER DRAWING PACKAGE
-
FIXING STRAPS TO HORIZONTAL FIREBREAK ARE SPALYED CORRECTLY WITH STRAPS TRIMMED TO 15 TO 20mm,
-
THE CORRECT FIXING HAS BEEN INSTALLED TO THE HORIZONTAL FIREBREAK FIXING STRAP AND IS CORRECTLY SEATED TO FACE OF CONCRETE
-
FIXING STRAPS TO HORIZONTAL FIREBREAKS HAVE BEEN BENT CORRECTLY WITH NO DAMAGE OR COMPRESSION TO FIREBREAK FACE
-
HORIZONTAL FIREBREAKS HAVE THE CORRECT REQUIRED 23 TO 25mm CLEAR AIRFLOW REQUIREMENT
-
HORIZONTAL FIREBREAKS ARE NEATLY ABUTTED WITH NO GAPS OR DAMAGE, SILVER FOIL TAPE HAS BEEN INSTALLED TO TOP FACE OF FIREBREAK.
-
FIXINGS STRAPS TO VERTICAL FIREBREAKS ARE INSTALLED CORRECTLY
-
THE CORRECT FIXING HAS BEEN INSTALLED TO THE VERTICAL FIREBREAK FIXING STRAP AND IS CORRECTLY SEATED TO FACE OF CONCRETE
-
VERTICAL FIREBREAKS HAVE THE CORRECT 10mm OVERSIZE OF CAVITY REQUIREMENT
-
VERTICAL FIREBREAKS ARE NEATLY ABUTTED WITH NO GAPS OR DAMAGE, SILVER FOIL TAPE HAS BEEN INSTALLED TO TO FACE OF FIREBREAK.
-
A20 PROJECT MANAGER
-
CLIENT SITE MANAGER