Site conducted
-
Select date
-
Pawel Chyrzynski
-
Location
INSPECTION 01
-
MAIN CONTRACTOR
-
PROJECT NUMBER
-
QA sheet no
-
Elevation/Location
-
Comments
-
HAS THE TYVEK BREATHER MEMBRANE BEEN CORRECTLY LAPPED TO THE DESIGNED 150mm.
-
HAS TYVEK BREATHER MEMBRANE SINGLE SIDED TAPE BEEN APPLIED TO REQUIRED LAP/ JOINT DETAILS.
-
HAS THE TYVEK BREATHER MEMBRANE BEEN INSTALLED WITHOUT ANY RIPS OR DAMAGE.
-
HAVE ANY RIPS OR DAMAGE BEEN REPAIRED WITH THE CORRECT METHOD/ TYVEK TAPE INSTALLED.
-
HAVE THE BRACKETS BEEN INSTALLED TO THE CORRECT ALIGNMENT AND CORRECT SPACINGS AS PER THE CONSTRUCTION DRAWING PACKAGE.
-
HAVE THE HH BRACKETS BEEN INSTALLED AS PER CORRECT DIMENSIONS FROM GRIDLINES AND DATUMS.
-
HAVE THE CORRECT HH BRACKET FIXINGS AND QUANTITY BEEN INSTALLED BACK TO THE SUBSTRUCTURE AS PER DESIGN SPECIFICATION AND CORRECTLY TIGHTENED.
-
HAVE THE FIXINGS BEEN INSTALLED TO THE SINGLE AND DOUBLE HH BRACKETS IN TO SLIDING POINT AND LOAD POINT LOCATION AS PER THE DESIGN PACKAGE.
-
HAVE THE SUPPORT L RAILS FRAME BEEN INSTALLED ALIGNED AND LEVELED ACROSS THE ELEVATION WITH CORRECT FIXINGS
-
HAVE THE SUPPORT L RAILS ARE INSTALLED WITH GAPS IN CORRECT AREAS WHERE MOVEMENT JOINTS AS PER DESIGN PACKAGE.
-