Title Page

  • Site conducted

  • Conducted on

  • D TUCKER

  • CORE A ELEVATIONS
  • MAIN CONTRACTOR:

  • PROJECT NUMBER:

  • QA SHEET NO:

  • ELEVATION/LOCATION:

  • COMMENTS:

  • POINTING IS CORRECTLY APPLIED TO ALL HORIZONTAL & VERTICAL JOINTS.

  • POINTING IS EVENLY COLOURED ACROSS ELEVATIONS WITH NO VISABLE PATCHING.

  • POINTING INSTALLED WITH A SMOOTH TRANSITION TO PERP AND BED JOINT.

  • POINTING COMPLETE TO ELEVATIONS WITH NO MISSED DETAILS.

  • POINTING HAS BEEN SUITABLY CLEANED TO FACE OF BRICKSLIP WITH NO RESIDUE STAINING.

  • MASTIC POINTING INSTALLED TO JOINT DETAILS WITH FINISH AS PER AGREED BENCHMARK REQUIREMENTS.

  • VERTICAL TO HORIZONTAL ABUTMENTS ARE CORRECTLY TOOLED & FINSHED.

  • BACKING RODS ARE INSTALLED TO LARGER OPENINGS WHERE REQUIRED.

  • CORRECT COLOUR & SPECIFICATION HAS BEEN INSTALLED AS PER A2O DESIGN PACKAGE OR CLIENT INSTRUCTION.

  • A20 PROJECT MANAGER

  • CLIENT SITE MANAGER

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.