CORE A ELEVATIONS
-
MAIN CONTRACTOR:
-
PROJECT NUMBER:
-
QA SHEET NO:
-
ELEVATION/LOCATION:
-
COMMENTS:
-
POINTING IS CORRECTLY APPLIED TO ALL HORIZONTAL & VERTICAL JOINTS.
-
POINTING IS EVENLY COLOURED ACROSS ELEVATIONS WITH NO VISABLE PATCHING.
-
POINTING INSTALLED WITH A SMOOTH TRANSITION TO PERP AND BED JOINT.
-
POINTING COMPLETE TO ELEVATIONS WITH NO MISSED DETAILS.
-
POINTING HAS BEEN SUITABLY CLEANED TO FACE OF BRICKSLIP WITH NO RESIDUE STAINING.
-
MASTIC POINTING INSTALLED TO JOINT DETAILS WITH FINISH AS PER AGREED BENCHMARK REQUIREMENTS.
-
VERTICAL TO HORIZONTAL ABUTMENTS ARE CORRECTLY TOOLED & FINSHED.
-
BACKING RODS ARE INSTALLED TO LARGER OPENINGS WHERE REQUIRED.
-
CORRECT COLOUR & SPECIFICATION HAS BEEN INSTALLED AS PER A2O DESIGN PACKAGE OR CLIENT INSTRUCTION.
-